少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

PS LED PCBA Board Shenzhen High Quality LED PCB PCBA Manufacturer Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Pieces US$5.00

100-999 Pieces US$1.00

1,000+ Pieces US$0.10

Sepcifications

  • Dielectric FR-4
  • Transport Package Box
  • Specification <1500mm
  • Trademark PS Electronics
  • Origin China
  • Quality Test Aoi, 100% E-Test
  • V- Cut Tolerance +-10mi
  • Bevel Edge +-5mil
  • Hole Location Tolerance +-2mil
  • Hole Diameter Tolerance +-0.05mm
  • Board Thickness Tolerance +-5%
  • Line Width/Space Tolerance +-10%

Product Description

PCB Parameters Item PCB Parameters Material FR4 (140Tg, 170Tg, 180Tg), FR-406, FR-408, 370HR, IT180A, Metal Core, Polyimide, Rogers 4350B/3003/4003C/5880, Taconic, Teflon, etc Material Brands KB, ITEQ, SY, ISOLA, Rogers (Arlon), Ventec, Laird, Nelco, Bergquist, DENKA, Panasonic, Taconic, or other ...

Learn More

PCB Manufacturing Comparison
Transaction Info
Price US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms - - - - -
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Product Attributes
Specification
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Supplier Name

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

武威市| 梨树县| 大英县| 二手房| 桑植县| 阿拉善右旗| 开江县| 醴陵市| 崇州市| 崇义县| 禹城市| 无为县| 金溪县| 平潭县| 兴隆县| 遂川县| 旬邑县| 洪泽县| 武定县| 清河县| 临海市| 泸州市| 正宁县| 彭水| 汉沽区| 蒙阴县| 邵阳县| 日喀则市| 新疆| 泰安市| 泸西县| 安乡县| 全椒县| 卢湾区| 海安县| 江北区| 晋城| 汝阳县| 灵台县| 九台市| 平乐县|