少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Premium LED PCBA Assembly Board for Electronics Manufacturing Solutions Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Pieces US$5.00

100-999 Pieces US$1.00

1,000+ Pieces US$0.10

Sepcifications

  • Dielectric FR-4
  • Transport Package Box
  • Specification <1500mm
  • Trademark PS Electronics
  • Origin China
  • Quality Test Aoi, 100% E-Test
  • V- Cut Tolerance +-10mi
  • Bevel Edge +-5mil
  • Hole Location Tolerance +-2mil
  • Hole Diameter Tolerance +-0.05mm
  • Board Thickness Tolerance +-5%
  • Line Width/Space Tolerance +-10%

Product Description

PCB Parameters Item PCB Parameters Material FR4 (140Tg, 170Tg, 180Tg), FR-406, FR-408, 370HR, IT180A, Metal Core, Polyimide, Rogers 4350B/3003/4003C/5880, Taconic, Teflon, etc Material Brands KB, ITEQ, SY, ISOLA, Rogers (Arlon), Ventec, Laird, Nelco, Bergquist, DENKA, Panasonic, Taconic, or ...

Learn More

Premium PCBA Comparison
Transaction Info
Price US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms - - - - -
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Product Attributes
Specification
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Supplier Name

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

买车| 新巴尔虎右旗| 天峻县| 乐山市| 邳州市| 霍林郭勒市| 津南区| 五台县| 阜阳市| 杭锦后旗| 巴南区| 威海市| 葫芦岛市| 商河县| 阳曲县| 甘南县| 安徽省| 图片| 桃江县| 万全县| 布拖县| 宣武区| 绥中县| 蓬安县| 惠东县| 白朗县| 华池县| 荣昌县| 崇左市| 石泉县| 三亚市| 北碚区| 开封市| 阳谷县| 汝阳县| 琼中| 渝北区| 衡水市| 长沙县| 旅游| 方正县|