少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Decorative Concrete Block Plastic Paver Mould

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 piece US$0.80-1.50 / piece

Sepcifications

  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material PP
  • Process Combination Type Single-Process Mode
  • Application Household Appliances, Home Use, Street Pavement
  • Runner Hot Runner
  • Design Software Pro-E
  • Installation Fixed
  • Certification TS16949, CE, ISO, FDA
  • Standard HASCO
  • Customized Negotiate
  • Transport Package Carton Box
  • Specification thickness: 1-10mm
  • Trademark LYA
  • Origin China
  • Mould Color White,Black,Green,Red
  • Size as Design Change
  • Mould Life More Than 1500 Times
  • Surface Smooth
  • Usage DIY

Product Description

decorative concrete block plastic paver mould Product Description Product Type: Plastic paver mould Material: Plastic/Rubber Life: Over 5 years Shape: Different shapes Usage: Indoor &outdoor wall cladding &the road of printing Thickness: 1~10mm Package: Inner packing: polybag ...

Learn More

Pave Stone Mould Comparison
Transaction Info
Price US$0.80-1.50 / piece US$0.10-20.00 / Piece US$2,000.00-10,000.00 / Set US$2,000.00-10,000.00 / Set US$8,000.00-25,000.00 / Set
Min Order 500 piece 10 Pieces 1 Set 1 Set 1 Set
Payment Terms LC, T/T, PayPal, D/P, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union - - LC, T/T, D/P, PayPal, Western Union
Quality Control
Product Certification TS16949, CE, ISO, FDA TS16949 ISO ISO -
Management System Certification - - - - -
Trade Capacity
Export Markets Africa Domestic Domestic Domestic South America, Africa
Annual Export Revenue - - - - -
Business Model ODM, OEM Own Brand, ODM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Product Attributes
Specification
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Household Appliances, Home Use, Street Pavement;
Runner: Hot Runner;
Design Software: Pro-E;
Installation: Fixed;
Standard: HASCO;
Customized: Negotiate;
Mould Color: White,Black,Green,Red;
Size: as Design Change;
Mould Life: More Than 1500 Times;
Surface: Smooth;
Usage: DIY;
Shaping Mode: CNC Machining;
Surface Finish Process: CNC Machining;
Plastic Material: UHMWPE;
Application: Commodity, Sushi Machinery;
Installation: Fixed;
Customized: Customized;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: TPE;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Hot Runner;
Design Software: AutoCAD;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Car Components Mould;
Product Material: ABS,PA6,PA66,PP,PC,etc;
Quotation: According to Samples, Drawing and Specific Require;
Moldbase: Futaba,Lkm,Hasco,Dme You Can Choose;
Gate Type: Side Gate,Sub Gate,Pin Point Gate,Edge Gate etc;
Ejection System: Stripper Plate,Lifter,Push Bar,Ejection Pin etc;
Cavity Material: 738, 738h, 718, 718h, ,etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Mold Cavity: Single, Multi, Family;
Lead Time of First Samples: Around 4~7weeks;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: TPE;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Hot Runner;
Design Software: AutoCAD;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Injection Moulds;
Manufacture Type: Injection Mold, Surface Treatment Available;
Mold Life: 300,000-1,000,000 Cycles;
Gate Type: Side Gate,Sub Gate,Pin Point Gate,Edge Gate etc;
Ejection System: Stripper Plate,Lifter,Push Bar,Ejection Pin etc;
Cavity Material: 738, 738h, 718, 718h, ,etc;
Product Material: ABS,TPE,TPV,Tpo,etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Mold Cavity: Single, Multi, Family;
Lead Time of First Samples: Around 4~7weeks;
Shaping Mode: Injection Mould;
Surface Finish Process: Mirror Polishing;
Mould Cavity: Single Cavity;
Process Combination Type: Single-Process Mode;
Application: Car;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Customized: Customized;
Lead Time: 70 Days;
Mold Material: 718h;
Mould Life: 500,000 Shots;
Supplier Name

ZHENGZHOU LYA MACHINERY CO., LTD.

Gold Member Audited Supplier

Guangzhou Pinsheng Automation Industry Co., Ltd.

Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

Diamond Member Audited Supplier

Taizhou Tuofang Plastic Mould Co., Ltd

Gold Member Audited Supplier

Find more Pave Stone Mould bulkbuy Articles
安康市| 辽源市| 石河子市| 长寿区| 湄潭县| 杂多县| 朝阳县| 托克托县| 枞阳县| 镇赉县| 巩义市| 辽源市| 尉犁县| 鄂托克旗| 荣昌县| 宜昌市| 阜康市| 洞头县| 灵宝市| 马关县| 西乌珠穆沁旗| 溧阳市| 柳林县| 湖南省| 司法| 宝坻区| 麻江县| 镇原县| 长泰县| 五寨县| 襄城县| 堆龙德庆县| 桑日县| 平舆县| 临邑县| 隆尧县| 襄汾县| 黄平县| 鸡西市| 米泉市| 开封县|