Min. Order Reference FOB Price
2 Pieces US$300.00-3,000.00 / Piece
Product Description
plastic material hopper dryer hopper dryer drying machine hopper dryer machinery polyamide resin hopper 1. Stainless steel structure prevents the material from being polluted. 2. Aluminum crust, effective the thermal insulating. 3. The hopper can be separated from the bottoom for easy ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$300.00-3,000.00 / Piece | US$22,299.00-24,999.00 / Set | US$45.00-80.00 / Square Meter | Negotiable | Negotiable |
| Min Order | 2 Pieces | 1 Set | 100 Square Meters | 1 Set | 1 Set |
| Payment Terms | LC, T/T | T/T | T/T, LC, D/P | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | Quality Control |
| Product Certification | - | - | Ce, ISO | - | - |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic |
| Annual Export Revenue | - | - | 100,000,000 RMB | - | - |
| Business Model | ODM, OEM | - | ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
Yuyao Guotai Rubber & Plastic Machinery Co., Ltd.
|
Qingdao Zhongrui Plastics Machinery Co., Ltd.
|
Qingdao Jiahexin Steel Co., Ltd.
|
Shandong Gold Lead Machinery Co., Ltd.
|
Shandong Gold Lead Machinery Co., Ltd.
|