少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Plastic Injection Electronic Parts
US$0.10-2.00 / Piece
  • Recommend for you
  • What is Plastic Part Production for Chrome Bathroom Shower Water Stop Valve
  • What is Customized High Precision Electric Injection Molding Plastic Parts in China
  • What is High-Strength & Premium-Finish Custom Plastic Parts with Dual-Injection Molding for Branded Consumer Electronics

What is Customized Plastic Injection Service Plastic Injection Molding

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$0.10-2.00 / Piece

Sepcifications

  • Material ABS
  • Application Sanitaryware
  • Certification TS16949, RoHS, ISO
  • Transport Package Carton
  • Specification 45*38*35
  • Trademark OEM
  • Origin Xiamen
  • Plastic Modling Type Injection
  • Design Software Ug, PRO, CAD, Proe.Ug.CAD
  • Mould Material S136, 718h, Nak80, P20, H13, etc
  • Delivery by Express, by Air, by Sea
  • Certificate ISO9001

Product Description

Factory Directly Supply: The Shower One-Button Water Stop Valve Product Description Item Factory Directly supply The Shower One-Button Water Stop Valve Material ABS, PC/ABS, PP, PC, POM(Delrin), Nylon 6, Nylon 6/6, PA 12, HDPE, LDPE, PS(HIPS), Acrylic, SAN/AS, ASA, PVC, UPVC, TPE, TPR, PU, ...

Learn More

Plastic Injection Electronic Parts Comparison
Transaction Info
Price US$0.10-2.00 / Piece US$1.00-100.00 / Piece US$1.00-100.00 / Piece US$2,000.00-6,000.00 / Piece US$2,000.00-6,000.00 / Piece
Min Order 100 Pieces 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram, X-Transfer LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment - -
Quality Control
Product Certification ISO9001 TS16949, RoHS, ISO TS16949, RoHS, ISO ISO ISO
Management System Certification ISO9001:2015 - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, Europe, Australia, South Asia North America, Europe, Australia, South Asia Domestic Domestic
Annual Export Revenue - - - - -
Business Model ODM, OEM ODM, OEM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Product Attributes
Specification
Material: ABS;
Application: Sanitaryware;
Plastic Modling Type: Injection;
Design Software: Ug, PRO, CAD, Proe.Ug.CAD;
Mould Material: S136, 718h, Nak80, P20, H13, etc;
Delivery: by Express, by Air, by Sea;
Material: ABS;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Finish: Color Painting, Texture, Silk Printing;
Material Used: ABS, PC, PS, PP, PVC, POM, PA66+GF, etc;
Tolerance: +/-0.1mm;
Surface Treatment: Chrome Plating, Silk-Printing, Laser Etching, Text;
Drawing Format: 2D/(Pdf/CAD)3D(Iges/Step);
Material: ABS;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Finish: Color Painting, Texture, Silk Printing;
Material Used: ABS, PC, PS, PP, PVC, POM, PA66+GF, etc;
Tolerance: +/-0.1mm;
Surface Treatment: Chrome Plating, Silk-Printing, Laser Etching, Text;
Drawing Format: 2D/(Pdf/CAD)3D(Iges/Step);
Material: ABS;
Application: Household, Electronics, Automotive;
Product Name: Plastic Parts Mold for Car;
Enginnering Plastic: PA, PA6, PA66, PC+ABS, PA46, PA+30% GF, PC, ABS;
Mold Base: Lkm 50 Standard Mould Base or Self-Made;
Ejection System: Stripper Plate, Lifter, Push Bar, Ejection Pin etc;
Process: Grinding, Milling, Drilling, etc.;
Material of Steel: M2, Skh-9, Skh-51, M35, M42, Sp23;
Mold Runner: Hot/Cold Runner;
Lead Timelead Time of First Samples: Around 4~7weeks;
Mould Life: >300 Thousand Times;
Shipping Packing: Wood Case or Carton Box;
Material: ABS;
Application: Household, Electronics, Automotive;
Product Name: Plastic Parts Mold for Car;
Enginnering Plastic: PA, PA6, PA66, PC+ABS, PA46, PA+30% GF, PC, ABS;
Mold Base: Lkm 50 Standard Mould Base or Self-Made;
Ejection System: Stripper Plate, Lifter, Push Bar, Ejection Pin etc;
Process: Grinding, Milling, Drilling, etc.;
Material of Steel: M2, Skh-9, Skh-51, M35, M42, Sp23;
Mold Runner: Hot/Cold Runner;
Lead Timelead Time of First Samples: Around 4~7weeks;
Mould Life: >300 Thousand Times;
Shipping Packing: Wood Case or Carton Box;
Supplier Name

Xiamen Xin Shi Wei Precision Mould Co., Ltd.

Diamond Member Audited Supplier

Xiamen Ballgarii General Equipment Co., Ltd.

Diamond Member Audited Supplier

Xiamen Ballgarii General Equipment Co., Ltd.

Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

Diamond Member Audited Supplier

Dongguan Howe Precision Mold Co.,LTD

Diamond Member Audited Supplier

抚顺县| 东阳市| 修武县| 神池县| 安达市| 城固县| 荣成市| 灵宝市| 津市市| 临沂市| 重庆市| 奎屯市| 宜州市| 南皮县| 安丘市| 台北县| 屏南县| 云龙县| 常州市| 巴马| 和林格尔县| 上犹县| 黄山市| 赣州市| 囊谦县| 富民县| 茌平县| 平谷区| 桃园市| 台南县| 黔东| 隆尧县| 阜南县| 霸州市| 垦利县| 陕西省| 玉龙| 黑水县| 东乡族自治县| 绵竹市| 资兴市|