Min. Order Reference FOB Price
1 Set US$200,000.00-5,000,000.00 / Set
Product Description
Low Raw Material Cost Gypsum Board Equipment Product Description 1. Production Describtion This GYPSUM BOARD PRODUCTION LINE used the calcined gypsum powder, water and various additives are automatically and separately measured and conveyed into the mixer by continuous auto-conveying system. ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$200,000.00-5,000,000.00 / Set | US$25,000.00 / Piece | US$300,000.00-1,000,000.00 / set | US$13,571.00 / Piece | US$180,000.00 / Set |
| Min Order | 1 Set | 1 Piece | 1 set | 1 Piece | 1 Set |
| Payment Terms | LC, T/T | LC, T/T, Western Union, PayPal | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | T/T, Western Union | LC, T/T | Quality Control |
| Product Certification | CE, ISO | CE, ISO | CE, ISO | CE, ISO | CE |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, Southeast Asia/ Mideast, Africa, Domestic, Mid Asia | South America, Southeast Asia/ Mideast, Africa | Domestic | South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic | Southeast Asia/ Mideast |
| Annual Export Revenue | - | - | - | 6,000,000 RMB | - |
| Business Model | Own Brand, ODM, OEM | ODM, OEM | ODM, OEM | ODM, OEM | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
SHIJIAZHUANG WUXING MECHANICAL CO., LTD.
|
Guangxi Hongfa Heavy Machinery Co., Ltd.
|
Shandong Minghung Osb&Mdf Machinery Equipment Manufacturing Co., Ltd
|
Jinan Libo Precision Machinery Equipment Co., Ltd.
|
Linyi Huihang Machinery Co., Ltd.
|