少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Efficient Lab Chamber
US$10,000.00-20,000.00 / Piece
  • Recommend for you
  • What is Advanced Dust Test Chamber with Precise Temperature and Humidity Control
  • What is Industry-Grade Low Pressure Lab Chamber with Fast Delivery and Shipping Cost Contact
  • What is High-Performance Temperature Test Chamber for Labs and Industry

What is Rapid Environment Test Chamber for Efficient Lab and Hospital Use

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$10,000.00-20,000.00 / Piece

Sepcifications

  • After-sales Service Video Intallment
  • Power Supply Customize
  • Certification ISO
  • Warranty 2 Years
  • Transport Package Wooden Box
  • Specification 1000x1000x1200
  • Trademark WBE
  • Origin Guandong, China
  • Application Industry, School, Hospital, Lab
  • Delivery Time 20 Days After Receive The Deposit
  • Controller Programmable LCD Touch Screen
  • Type Rapid Temperature Change Test Chamber

Product Description

Product Description Rapid Temperature Change Test Chamber: With reliability development, companies aim to quickly find product defects or stabilize before shipment. Rapid temperature testing is increasingly adopted. Mechanical refrigeration limits cooling rates, leading to more use of liquid ...

Learn More

Efficient Lab Chamber Comparison
Transaction Info
Price US$10,000.00-20,000.00 / Piece US$1,200.00-8,000.00 / Piece US$2,599.00-4,399.00 / Piece US$8,999.00-12,499.00 / Piece US$8,999.00-12,499.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, PayPal, Western Union LC, T/T, PayPal, Western Union LC, T/T, PayPal, Western Union LC, T/T, PayPal, Western Union
Quality Control
Product Certification ISO - CE CE CE
Management System Certification ISO9001:2015, ISO14001 - - - -
Trade Capacity
Export Markets Southeast Asia/ Mideast North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM - Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Video Intallment;
Power Supply: Customize;
Warranty: 2 Years;
Application: Industry, School, Hospital, Lab;
Delivery Time: 20 Days After Receive The Deposit;
Controller: Programmable LCD Touch Screen;
Type: Rapid Temperature Change Test Chamber;
After-sales Service: Provide;
Power Supply: AC 380V, Three-Phase, Five-Wire, 50Hz. a Separate;
Warranty: 12 Months;
Workroom Dimensions: 1000×1000×1000mm (W*D*H);
Fine Dust: Under 75µm;
Coarse Dust: Under 150µm;
Airflow Velocity: No More Than 2m/S;
Dust Concentration: 2kg/M³;
Air Flow Meter: 1-20L/M;
Wire Mesh Diameter: 50µm;
Inner Box Material: SUS201 Stainless Steel Mirror Plate;
Load Capacity: 20kg;
Shock Time: 1s to 99h Adjustable;
Test Timer: 1s to 99h Adjustable;
Control System: PLC Controller + Touch Screen (Teelong);
Power: 6 Kw;
Outer Box Material: Plastic-Sprayed and Painted Iron Plate;
Usage: Temperature And Climate Test Chambers;
Volume: 80L;
Delivery Time: 3-5 days;
Customized: Yes;
Testing Before Delivery: Yes;
After-sale Customer Service: Yes;
OEM Service: Yes;
Usage: Xenon Test Chamber;
Continuous Lighting Time: More Than 2000 Hours;
Delivery Time: 5 days;
Customized: Yes;
Testing Before Delivery: Yes;
After-sale Customer Service: Yes;
OEM Service: Yes;
Usage: Xenon Test Chamber;
Continuous Lighting Time: More Than 2000 Hours;
Delivery Time: 5 days;
Customized: Yes;
Testing Before Delivery: Yes;
After-sale Customer Service: Yes;
OEM Service: Yes;
Supplier Name

Dongguan Weibang Instrument Equipment Co., Ltd.

Diamond Member Audited Supplier

Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.

Diamond Member Audited Supplier

Guangdong Hongtuo Instrument Technology Co., Ltd.

Gold Member Audited Supplier

Guangdong Hongtuo Instrument Technology Co., Ltd.

Gold Member Audited Supplier

Guangdong Hongtuo Instrument Technology Co., Ltd.

Gold Member Audited Supplier

临沭县| 阿勒泰市| 五台县| 大方县| 蓝田县| 建湖县| 林甸县| 龙山县| 新河县| 青神县| 林口县| 井研县| 鄂托克前旗| 达尔| 襄垣县| 全南县| 京山县| 东源县| 特克斯县| 达日县| 顺平县| 安乡县| 清河县| 亳州市| 桃江县| 平塘县| 玛沁县| 德惠市| 新津县| 敦煌市| 哈密市| 墨玉县| 台安县| 海宁市| 庄河市| 库车县| 彭泽县| 通州市| 曲沃县| 南乐县| 柳林县|