少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

4PCS 5.5 Inch+2PCS 1 Inch+ 15 Inch Powered Active DSP Sub Line Array Loudspeaker System

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Pieces US$200.00

100+ Pieces US$2,000.00

Sepcifications

  • Transport Package Carton
  • Specification plywood
  • Trademark Skyrann
  • Origin China
  • Color Black
  • Way Two Way

Product Description

4pcs 5.5 inch+2psc 1 inch+ 15 inch Powered active DSP sub Line Array Loudspeaker System Parameters: Sub model is L15b. sub is 15" active. 381mm magnet and 75mm voice coil. 4 ohm. Rated power is 450W. Build in 32 bit DSP. Amplfiier power is 700W. size: ...

Learn More

Line Array Loudspeaker Comparison
Transaction Info
Price US$200.00-2,000.00 / Piece US$18.00 / Piece US$18.00 / Piece US$18.00 / Piece US$18.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, Eastern Europe, Southeast Asia North America, Europe North America, Europe North America, Europe North America, Europe
Annual Export Revenue - - - - -
Business Model - Own Brand, OEM Own Brand, OEM Own Brand, OEM Own Brand, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Color: Black;
Way: Two Way;
MOQ: 1;
Interface: USB-C;
Quality: AAA+++;
Shipping Time: 5-8 Day;
MOQ: 1;
Interface: USB-C;
Quality: AAA+++;
Shipping Time: 5-8 Day;
MOQ: 1;
Interface: USB-C;
Quality: AAA+++;
Shipping Time: 5-8 Day;
MOQ: 1;
Interface: USB-C;
Quality: AAA+++;
Shipping Time: 5-8 Day;
Supplier Name

GZ SKYRANN ELECTRONIC TECH CO., LTD.

Gold Member Audited Supplier

Shenzhen Xinfan Technology Co., Ltd.

Diamond Member Audited Supplier

Shenzhen Xinfan Technology Co., Ltd.

Diamond Member Audited Supplier

Shenzhen Xinfan Technology Co., Ltd.

Diamond Member Audited Supplier

Shenzhen Xinfan Technology Co., Ltd.

Diamond Member Audited Supplier

汶川县| 菏泽市| 天祝| 鹤峰县| 麦盖提县| 巴马| 浠水县| 法库县| 贵港市| 巧家县| 永川市| 阳朔县| 铜山县| 西宁市| 柘荣县| 清徐县| 安新县| 庆元县| 青神县| 黑河市| 淮南市| 宜兴市| 岱山县| 海晏县| 晴隆县| 株洲市| 沅江市| 华亭县| 庆阳市| 津市市| 正镶白旗| 丁青县| 申扎县| 浠水县| 惠安县| 黔江区| 牟定县| 那坡县| 绵阳市| 吉林市| 赣榆县|