Purchase Qty. Reference FOB Price
1-9 Pieces US$376.00
10-49 Pieces US$370.00
50+ Pieces US$365.00
Product Description
Product Description Name PV combiner box System maximum de voltage 1000 Maximum input current for each string 20A Maximum input strings 2 44Maximum outpui switch current 40A Number of invener MPPT 1 Number of Outpui strings 1 Category of test II grade protection Nominal discharge ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$365.00-376.00 / Piece | US$136.00-199.00 / Piece | US$136.00-199.00 / Piece | US$136.00-199.00 / Piece | US$136.00-199.00 / Piece |
| Min Order | 1 Piece | 1 Piece | 1 Piece | 1 Piece | 1 Piece |
| Payment Terms | T/T, PayPal, Western Union | LC, T/T | LC, T/T | LC, T/T | LC, T/T | Quality Control |
| Product Certification | ISO9001:2000, CCC, TUV CE CQC | ISO9001:2000, VDE, CCC, CE | ISO9001:2000, VDE, CCC, CE | ISO9001:2000, VDE, CCC, CE | - |
| Management System Certification | ISO9001:2015 | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic | Southeast Asia/ Mideast | Southeast Asia/ Mideast | Southeast Asia/ Mideast | Southeast Asia/ Mideast |
| Annual Export Revenue | 3,456,950 RMB | - | - | - | - |
| Business Model | Own Brand, ODM, OEM | - | - | - | - |
| Average Lead Time | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
Zhejiang Mingguan Electric Co., Ltd.
|
Stardynamic Power Equipment (Fuzhou) Co., Ltd.
|
Stardynamic Power Equipment (Fuzhou) Co., Ltd.
|
Stardynamic Power Equipment (Fuzhou) Co., Ltd.
|
Stardynamic Power Equipment (Fuzhou) Co., Ltd.
|