Min. Order Reference FOB Price
1 Piece US$71,143.00-80,036.00 / Piece
Product Description
Product Description Dual-proportional control hydraulic power system Dual-proportional control of the hydraulic system, intelligent dynamic operation, clear high-pressure throttling, reduce oil temperature. Improve the stability of the whole machine and ensure the product quality. Flexible ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$71,143.00-80,036.00 / Piece | US$58,622.00-62,200.00 / Piece | US$56,500.00-72,000.00 / Piece | US$78,600.00 / Set | US$279,500.00 / Set |
| Min Order | 1 Piece | 1 Piece | 1 Piece | 1 Set | 1 Set |
| Payment Terms | LC, T/T, D/P | LC, T/T | LC, T/T | LC, T/T | LC, T/T | Quality Control |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | Domestic | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Western Europe |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | - | - | - | - |
| Average Lead Time | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
Guangdong Shimi Intelligent Equipment Co., Ltd
|
Jiangmen Zhenli Machinery Co., Ltd.
|
Jiangmen Zhenli Machinery Co., Ltd.
|
Jiangmen Zhenli Machinery Co., Ltd.
|
Jiangmen Zhenli Machinery Co., Ltd.
|