少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Transformer Test Bench
US$5,000.00-70,000.00 / Set
  • Recommend for you
  • What is 500kv AC Resonance Test System Variable Frequency Series Resonant Test Device
  • What is Hv Circuit Breaker Comprehensive Test System Dynamic Characteristics Analyzer
  • What is Variable Frequency Series Resonant Test Set AC Series Resonant Test System

What is Transformer Test Bench for Temperature Rise and Routine Compliance Testing

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$5,000.00-70,000.00 / Set

Sepcifications

  • After-sales Service Onsite and Video Call Remote Guidance
  • Warranty 2 Years Free Warranty Long Life Service
  • Max Diameter of Workpiece 2000mm
  • Mass Scope of Workpiece 1000kg
  • Type Universal Testing Machine
  • Maxcapacity <1000KN
  • Accuracy Grade 0.5
  • Load Way Electronic Load
  • Loading Method Dynamic Load
  • Display LCD Display
  • Control Computer Control
  • Weight 500-1000Kg
  • Power Source AC380V
  • Oil Cylinder Position Under
  • Transport Package Plywood Case
  • Specification 1000mm*600mm*560mm
  • Trademark Sansion
  • Origin China
  • Test Project1 Oil Chemical Test (Including Acid Value, Flash Poi
  • Test Project2 Transformer Insulation Resistance Test
  • Test Project3 Transformer Winding Resistance Test
  • Test Project4 Transformer Voltage Ratio Measurement and Connecti
  • Test Project5 Transformer No-Load Current Percentage and No-Load
  • Test Project6 Transformer Short-Circuit Impedance and Load Loss
  • Test Project7 Transformer Dielectric Loss Test
  • Test Project8 Power Frequency Withstand Voltage Test of Transfor
  • Test Project9 Transformer Induction Withstand Voltage Test (Incl
  • Test Project10 Lightning Impulse Test (Including Full Wave and Cu
  • Type Test Temperature Rise Test
  • Special Experiment1 Zero Sequence Impedance Test
  • Special Experiment2 No Load Current Harmonic Test

Product Description

Product Description Transformer Test Bench for Temperature Rise and Routine Compliance Testing General Information: SXBZ-III series Transformer Comprehensive Test Bench is applied for ex-work and maintenance detecting on varioustransformers. lt's widely used in the fields of power supply and ...

Learn More

Transformer Test Bench Comparison
Transaction Info
Price US$5,000.00-70,000.00 / Set US$800.00-2,500.00 / Piece US$800.00-2,500.00 / Piece US$800.00-2,500.00 / Piece US$2,000.00-6,000.00 / Piece
Min Order 1 Set 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, PayPal, Western Union LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification ISO9001:2015, ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001
Trade Capacity
Export Markets North America, South America, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast
Annual Export Revenue - 12,540,865 RMB 12,540,865 RMB 12,540,865 RMB 12,540,865 RMB
Business Model Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Onsite and Video Call Remote Guidance;
Warranty: 2 Years Free Warranty Long Life Service;
Max Diameter of Workpiece: 2000mm;
Mass Scope of Workpiece: 1000kg;
Type: Universal Testing Machine;
Maxcapacity: <1000KN;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Dynamic Load;
Display: LCD Display;
Control: Computer Control;
Weight: 500-1000Kg;
Power Source: AC380V;
Oil Cylinder Position: Under;
Test Project1: Oil Chemical Test (Including Acid Value, Flash Poi;
Test Project2: Transformer Insulation Resistance Test;
Test Project3: Transformer Winding Resistance Test;
Test Project4: Transformer Voltage Ratio Measurement and Connecti;
Test Project5: Transformer No-Load Current Percentage and No-Load;
Test Project6: Transformer Short-Circuit Impedance and Load Loss;
Test Project7: Transformer Dielectric Loss Test;
Test Project8: Power Frequency Withstand Voltage Test of Transfor;
Test Project9: Transformer Induction Withstand Voltage Test (Incl;
Test Project10: Lightning Impulse Test (Including Full Wave and Cu;
Type Test: Temperature Rise Test;
Special Experiment1: Zero Sequence Impedance Test;
Special Experiment2: No Load Current Harmonic Test;
After-sales Service: Life Long Support;
Warranty: 1 Year;
Type: DC Hipot Tester;
Accuracy Grade: 1;
Power Source: AC220V;
Over Voltage Rectify Accuracy: <=1.0%;
Ripple Factor: <=0.5%;
Hv Polarity: Polarity of Negative Volt, Zero Voltage Start;
After-sales Service: Life Long Support;
Warranty: 1 Year;
Type: DC Hipot Tester;
Accuracy Grade: 1;
Power Source: AC220V;
Over Voltage Rectify Accuracy: <=1.0%;
Ripple Factor: <=0.5%;
Hv Polarity: Polarity of Negative Volt, Zero Voltage Start;
After-sales Service: Life Long Support;
Warranty: 1 Year;
Type: DC Hipot Tester;
Accuracy Grade: 1;
Power Source: AC220V;
Over Voltage Rectify Accuracy: <=1.0%;
Ripple Factor: <=0.5%;
Hv Polarity: Polarity of Negative Volt, Zero Voltage Start;
Type: Strength Testing Machine;
Display: LCD;
Power Source: AC220V;
Input: 220 +-10% Volts AC, 50/60 Hz, Single Phase;
Output Frequency: 0.1Hz, 0.05Hz, 0.02Hz;
Stability of Frequency: Fluctuation < 0.5%;
Measurement Accuracy: +-3%;
Positive and Negative Voltage Peak Error: <=3%;
Voltage Waveform Distortion: <=5%;
Humidity: <=85%;
Supplier Name

Sansion Power Electric Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

郁南县| 西青区| 周至县| 师宗县| 长宁县| 隆林| 乐平市| 鄂尔多斯市| 阿图什市| 汨罗市| 长武县| 乡城县| 偃师市| 盘锦市| 射洪县| 丹阳市| 铜梁县| 吐鲁番市| 荔浦县| SHOW| 通河县| 元谋县| 乌拉特后旗| 博爱县| 开江县| 鲁甸县| 民乐县| 昭苏县| 通城县| 彭山县| 永吉县| 略阳县| 曲靖市| 石阡县| 磐石市| 特克斯县| 和龙市| 独山县| 库尔勒市| 林甸县| 南安市|