少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Post Scaffold Steel Scaffolding Shoring Formwork System for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

25 Tons US$5.00-10.00 / Ton

Sepcifications

  • After-sales Service Return and Replace
  • Warranty More Than 5years
  • Certification ISO, CE
  • Material Steel
  • Transport Package Metal Pallets
  • Specification 2m/3.6m, 1.75m/3m, 2.2m/4m
  • Trademark QS
  • Origin China

Product Description

Company Profile Qingdao Scaffolding Co., Ltd. is the biggest manufacturer and exporter of scaffolding in the whole of China. The quality of our products is as good as that made in the U.K., but the price is more competitive. We started to supply the U.K. market with scaffolding ...

Learn More

Steel Props Comparison
Transaction Info
Price US$5.00-10.00 / Ton US$90.00-130.00 / Square Meter US$80.00-180.00 / Square Meter Negotiable US$59.00-98.00 / Square Meter
Min Order 25 Tons 500 Square Meters 1,000 Square Meters 1,000 Square Meters 500 Square Meters
Payment Terms LC, T/T LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Product Certification ISO, CE Patent Certificate International Standard International Standard International Standard
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Product Attributes
Specification
After-sales Service: Return and Replace;
Warranty: More Than 5years;
Material: Steel;
After-sales Service: Return and Replace;
Warranty: More That Five Years;
Material: Steel;
Type: Slab Formwork;
After-sales Service: Engineer on-Site Guidance.;
Warranty: 36 Months;
Material: Steel;
Type: Slab Formwork;
Name: Formwork;
Props Surface Finish: Powder Coated+Hot Dipped Galv;
Surface Treatment: Powder Coating;
Powder Coating: 12/15mm Plywood;
Usage: Concorete Panels Shuttering Formwork;
Application: Concrete Construction;
After-sales Service: Engineer on-Site Guidance.;
Warranty: 36 Months;
Material: Steel;
Type: Slab Formwork;
Name: Formwork;
Props Surface Finish: Powder Coated+Hot Dipped Galv;
Surface Treatment: Powder Coating;
Powder Coating: 12/15mm Plywood;
Usage: Concorete Panels Shuttering Formwork;
Application: Concrete Construction;
After-sales Service: Engineer on-Site Guidance.;
Warranty: 36 Months;
Material: Steel;
Type: Slab Formwork;
Name: Formwork;
Props Surface Finish: Powder Coated+Hot Dipped Galv;
Surface Treatment: Powder Coating;
Powder Coating: 12/15mm Plywood;
Usage: Concorete Panels Shuttering Formwork;
Application: Concrete Construction;
Supplier Name

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

邵阳市| 化州市| 新绛县| 同江市| 宜丰县| 阳西县| 嘉兴市| 静宁县| 华安县| 潼南县| 临夏县| 凉山| 临猗县| 如皋市| 昆山市| 明水县| 高淳县| 介休市| 历史| 双柏县| 昭觉县| 当阳市| 呼和浩特市| 泰顺县| 宁国市| 通榆县| 辛集市| 四川省| 顺义区| 余江县| 荥经县| 平潭县| 昌乐县| 刚察县| 定兴县| 河北省| 东兴市| 康保县| 德庆县| 彰化县| 太湖县|