少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Three Phase Motor Controller and Protector (MP-M3)

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

50-499 Pieces US$29.00

500+ Pieces US$26.00

Sepcifications

  • Transport Package Paper Carton
  • Specification CE
  • Trademark Leading science technology
  • Origin China
  • Rated Output Power 0.75-4kw 5.5-7.5kw
  • Rate Input Power AC 380-415V
  • Trip Response Time of Overload 5sec-5min Adjustable
  • Trip Response Time of Open Phase 2sec
  • Trip Response Time of Short Circuit 0.1sec
  • Trip Response Time of Under/Over Voltage 5sec
  • Recovery Time of Overload 30min
  • Recovery Time of Dry Run 30min
  • Task Program
  • Structure Closed-Loop

Product Description

Application: Start &Protection for Three Phase Pump Motor Main Features: Over Load Protection Motor Stalled Protection Under Voltage Protection Over Voltage Protection Open Phase Protection Transient Surge Protection Visual &Audio Alarm For Fault Prompt LCD Screen Displays Pump Running ...

Learn More

Motor Protector Comparison
Transaction Info
Price US$26.00-29.00 / Piece US$0.18-0.30 / Piece US$0.18-0.30 / Piece US$0.18-0.30 / Piece US$0.18-0.30 / Piece
Min Order 50 Pieces 1,000 Pieces 1,000 Pieces 1,000 Pieces 1,000 Pieces
Payment Terms LC, T/T LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Europe, Domestic Europe, Domestic Europe, Domestic Europe, Domestic
Annual Export Revenue - - - - -
Business Model - ODM ODM ODM ODM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Rated Output Power: 0.75-4kw 5.5-7.5kw;
Rate Input Power: AC 380-415V;
Trip Response Time of Overload: 5sec-5min Adjustable;
Trip Response Time of Open Phase: 2sec;
Trip Response Time of Short Circuit: 0.1sec;
Trip Response Time of Under/Over Voltage: 5sec;
Recovery Time of Overload: 30min;
Recovery Time of Dry Run: 30min;
Task: Program;
Structure: Closed-Loop;
Life Cycle: 10000 Times;
Voltage & Current: 250V 16A;
Contact Type: Normally Closed or Normally Open;
Switch Type: Auto Reset or Manual Reset;
Life Cycle: 10000 Times;
Contact Type: Normally Closed or Normally Open;
Voltage & Current: 250V 16A;
Switch Type: Auto Reset or Manual Reset;
Life Cycle: 10000 Times;
Voltage & Current: 250V 16A;
Contact Type: Normally Closed or Normally Open;
Switch Type: Auto Reset or Manual Reset;
Life Cycle: 10000 Times;
Voltage & Current: 250V 16A;
Contact Type: Normally Closed or Normally Open;
Switch Type: Auto Reset or Manual Reset;
Supplier Name

Hunan Leading Science & Technology Development Co., Ltd.

Diamond Member Audited Supplier

Dongguan City Heng Hao Electric Co., Ltd.

Diamond Member Audited Supplier

Dongguan City Heng Hao Electric Co., Ltd.

Diamond Member Audited Supplier

Dongguan City Heng Hao Electric Co., Ltd.

Diamond Member Audited Supplier

Dongguan City Heng Hao Electric Co., Ltd.

Diamond Member Audited Supplier

美姑县| 上林县| 台东市| 宜兰县| 且末县| 温宿县| 和田县| 当雄县| 久治县| 临沧市| 长治县| 巫溪县| 神农架林区| 垣曲县| 朝阳县| 平度市| 定安县| 西安市| 巧家县| 牙克石市| 白银市| 莆田市| 泸溪县| 托克逊县| 陇南市| 贡山| 白银市| 阿克| 托克逊县| 稷山县| 顺昌县| 田东县| 烟台市| 寻乌县| 平南县| 中宁县| 呼伦贝尔市| 大竹县| 建始县| 汝州市| 靖西县|