Min. Order Reference FOB Price
1 Set US$60,000.00-80,000.00 / Set
Product Description
Product Description Parameters. NO. ITEM Technical parameters 1 Maximum wellhead size length:1600mm,width:1300mm 2 Molding depth 500 mm 3 Applicable material thickness 1-10mm 4 main power supply three-phase, five-wire (PRC) 380V±15V,50Hz 5 heating power Upper furnace:41kw; ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$60,000.00-80,000.00 / Set | US$520,000.00-580,000.00 / Set | US$150,000.00-220,000.00 / Set | US$150,000.00-220,000.00 / Set | US$150,000.00-220,000.00 / Set |
| Min Order | 1 Set | 1 Set | 1 Set | 1 Set | 1 Set |
| Payment Terms | T/T | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | Quality Control |
| Product Certification | - | CE | ISO9001:2008 | ISO9001:2008 | ISO9001:2008 |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | East Asia(Japan/ South Korea) | East Asia(Japan/ South Korea) | East Asia(Japan/ South Korea) | East Asia(Japan/ South Korea) |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | Own Brand, ODM | Own Brand, ODM | Own Brand, ODM | Own Brand, ODM |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 1-3 months | Product Attributes |
| Specification | |||||
| Supplier Name |
Guangdong Pudi Machinery Equipment Co., Ltd.
|
Shantou Designer Precise Machinery Co., Ltd
|
Shantou Designer Precise Machinery Co., Ltd
|
Shantou Designer Precise Machinery Co., Ltd
|
Shantou Designer Precise Machinery Co., Ltd
|