少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Custom LED PCB Assembly Solutions for Global OEM Suppliers Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Pieces US$5.00

100-999 Pieces US$1.00

1,000+ Pieces US$0.10

Sepcifications

  • Dielectric FR-4
  • Transport Package Box
  • Specification <1500mm
  • Trademark PS Electronics
  • Origin China
  • Quality Test Aoi, 100% E-Test
  • V- Cut Tolerance +-10mi
  • Bevel Edge +-5mil
  • Hole Location Tolerance +-2mil
  • Hole Diameter Tolerance +-0.05mm
  • Board Thickness Tolerance +-5%
  • Line Width/Space Tolerance +-10%

Product Description

PCB Parameters Item PCB Parameters Material FR4 (140Tg, 170Tg, 180Tg), FR-406, FR-408, 370HR, IT180A, Metal Core, Polyimide, Rogers 4350B/3003/4003C/5880, Taconic, Teflon, etc Material Brands KB, ITEQ, SY, ISOLA, Rogers (Arlon), Ventec, Laird, Nelco, Bergquist, DENKA, Panasonic, Taconic, or ...

Learn More

Tailored PCB Comparison
Transaction Info
Price US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece US$0.10-5.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms - - - - -
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Product Attributes
Specification
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Dielectric: FR-4;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Quality Test: Aoi, 100% E-Test;
V- Cut Tolerance: +-10mi;
Bevel Edge: +-5mil;
Hole Location Tolerance: +-2mil;
Hole Diameter Tolerance: +-0.05mm;
Board Thickness Tolerance: +-5%;
Line Width/Space Tolerance: +-10%;
Supplier Name

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

Ps Electronics Co., Ltd

Diamond Member Audited Supplier

刚察县| 营口市| 阜宁县| 抚州市| 哈密市| 鄯善县| 壶关县| 太原市| 天门市| 灵丘县| 民乐县| 政和县| 隆林| 中宁县| 来安县| 平利县| 合江县| 齐河县| 荥阳市| 池州市| 晴隆县| 景德镇市| 深水埗区| 景洪市| 济宁市| 大方县| 建昌县| 百色市| 阳原县| 凌源市| 沁阳市| 轮台县| 米脂县| 会理县| 沁水县| 格尔木市| 内丘县| 嘉鱼县| 泗水县| 琼中| 宁都县|