Purchase Qty. Reference FOB Price
1-4 Sets US$1,100.00
5+ Sets US$1,000.00
Product Description
Product Description · Precise High Voltage Technology: High power output, with extremely high powder deposition rate and penetration. Powder deposition is uniform on deep grooves, dead corners, and complex workpieces. · PCC Precision Charge Control: Current is precisely controlled within 0–10 μA, ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$1,000.00-1,100.00 / Set | US$400.00-1,000.00 / Piece | US$380.00-600.00 / Piece | US$1,000.00-1,800.00 / Piece | US$1,500.00-2,000.00 / Piece |
| Min Order | 1 Set | 1 Piece | 1 Piece | 1 Piece | 1 Piece |
| Payment Terms | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | LC, T/T, D/P, PayPal, Western Union | LC, T/T, D/P, PayPal, Western Union | LC, T/T, D/P, PayPal, Western Union | LC, T/T, D/P, PayPal, Western Union | Quality Control |
| Product Certification | CE ISO9001 TUV | CE | CE | CE | CE |
| Management System Certification | ISO9001:2015 | - | - | - | - | Trade Capacity |
| Export Markets | South America, Domestic, South Asia | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea) |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | Own Brand, ODM, OEM | ODM, OEM | ODM, OEM | ODM, OEM | ODM, OEM |
| Average Lead Time | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Product Attributes |
| Specification | |||||
| Supplier Name |
Bazhou Miaorun Hardware Products Factory
|
Weifang Galin Powder Coating Equipment Co., Ltd.
|
Weifang Galin Powder Coating Equipment Co., Ltd.
|
Weifang Galin Powder Coating Equipment Co., Ltd.
|
Weifang Galin Powder Coating Equipment Co., Ltd.
|
|
|