少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Air-Jet Valves
US$5.658-8.915 / Piece
  • Recommend for you
  • What is Different Size Factory Direct Sale Round Dowel Pin for Plastic Mold
  • What is Air Ejector Pin Standard Poppet Valve Injection Mold
  • What is High Quality Side Nail C1b Type

What is High Quality Components Wholesale Air Poppet Valves for Plastic Injection Mold

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$5.658-8.915 / Piece

Sepcifications

  • Type Plastic Mould Parts
  • Material Stainless Steel
  • Application Machinery, Daily Use
  • Certification ISO9001
  • Transport Package Plastic Box as Inner and Carton as Outer Box
  • Specification Q3
  • Trademark YIJING
  • Origin Foshan, Guangdong, China

Product Description

FAQ Q1: Are you a trade company or a manufacturer? A1: Dongguan Changping Zhenjia Mold Accessories Factory is a professional manufacturer of plastic mold hardware accessories, undertake the design and processing of positioning block, slide core units, to provide customers with production services ...

Learn More

Air-Jet Valves Comparison
Transaction Info
Price US$5.658-8.915 / Piece US$0.50-10.00 / Piece US$0.50-10.00 / Piece US$0.50-10.00 / Piece US$0.50-10.00 / Piece
Min Order 10 Pieces 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment Western Union, T/T Western Union, T/T Western Union, T/T Western Union, T/T
Quality Control
Product Certification ISO9001 ISO9001 ISO9001 ISO9001 ISO9001
Management System Certification ISO9001:2015 - - - -
Trade Capacity
Export Markets South America, Europe, Domestic North America, Europe North America, Europe North America, Europe North America, Europe
Annual Export Revenue - - - - -
Business Model Own Brand, ODM ODM, OEM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Product Attributes
Specification
Type: Plastic Mould Parts;
Material: Stainless Steel;
Application: Machinery, Daily Use;
Type: Stamping Die Parts;
Material: Carbide;
Application: Electronic, Hardware, Machinery, Daily Use, Furniture, Household Applicances, Car;
Tolerance: +/-0.01mm;
Type: Stamping Die Parts;
Material: Stainless Steel;
Application: Electronic, Hardware, Machinery, Daily Use, Furniture, Household Applicances, Car;
Tolerance: +/-0.01mm;
Surface Treatment: Fine-Finishing;
Type: Metal Casting Mould Parts;
Material: Carbide;
Application: Electronic, Hardware, Machinery, Daily Use, Furniture, Household Applicances, Car;
Type: Metal Casting Mould Parts;
Material: Carbide;
Application: Electronic, Hardware, Machinery, Household Applicances, Car, Medical Equipment;
Supplier Name

Foshan Yijing Mold Parts Co., Ltd.

Diamond Member Audited Supplier

Dongguan Sinyi Precision Metal Co., Ltd.

Diamond Member Audited Supplier

Dongguan Sinyi Precision Metal Co., Ltd.

Diamond Member Audited Supplier

Dongguan Sinyi Precision Metal Co., Ltd.

Diamond Member Audited Supplier

Dongguan Sinyi Precision Metal Co., Ltd.

Diamond Member Audited Supplier

扶沟县| 类乌齐县| 塔城市| 弥勒县| 新昌县| 陈巴尔虎旗| 临湘市| 瓮安县| 水富县| 定西市| 七台河市| 庄浪县| 灌云县| 通城县| 罗城| 会理县| 济宁市| 明星| 晋中市| 百色市| 武城县| 汤阴县| 唐海县| 蓬莱市| 罗江县| 汉川市| 鄂伦春自治旗| 南投市| 普安县| 洛宁县| 石家庄市| 济阳县| 茂名市| 泸水县| 即墨市| 苍梧县| 原阳县| 太谷县| 清原| 灵宝市| 云林县|