| Specification |
Product Name: G411 Steel Cable Thimble;
Material: Carbon Steel;
Size: 1/8''---2-1/2'' Wire Thimbles;
Color: Zinc Color;
Samples: for Free;
Delivery Time: Nearly 15-30 Days After Confirmed;
Surface: Electric-Galvanzied /Hot DIP Galvanzied;
Processing: Forged Wire Thimbles;
Pack: Cartons ,Then on Pallets;
Keywords: G411 Steel Cable Thimble;
|
Thickness: 1.8mm-3.0mm;
Model Number: UL050 Brass Key with Patterns;
Material: Brass, Zinc Alloy, Titanium, Iron and So on;
Support OEM Customization: Yes;
Logo: Everise and Per as Request;
Supply Ability: 3000000 Piece/Pieces Per Month;
MOQ: 10000PCS;
Lead Time: Ship Within 45 Days After Payment;
|
Thickness: 1.8mm-3.0mm;
Model Number: UL050 Brass Key with Patterns;
Material: Brass, Zinc Alloy, Titanium, Iron and So on;
Support OEM Customization: Yes;
Logo: Everise and Per as Request;
Supply Ability: 3000000 Piece/Pieces Per Month;
MOQ: 10000PCS;
Lead Time: Ship Within 45 Days After Payment;
|
Product Name: A342 Master Link;
Process: Heat Treatment+Surface Treatment;
Certificates: ISO9001, CE;
Surface Treatment: Powder Coated;
Size: 1/2"~4";
Trade Term: Fob, CFR, CIF;
MOQ: 100PCS;
Wll: 12300lbs ~ 373000lbs;
Treatment: Western Union, T/T, L/C;
Use: Lifting, Lifting Point, Lashing;
Lead Time: 10-15 Work Days;
Sample: Available;
Application: Lifting Fittings;
Grade: G80/100;
Feature: Flatened Madter Link;
|
Thickness: 1.8mm-3.0mm;
Model Number: Brass Key with Patterns;
Material: Brass, Zinc Alloy, Titanium, Iron and So on;
Support OEM Customization: Yes;
Logo: Everise and Per as Request;
Supply Ability: 3000000 Piece/Pieces Per Month;
MOQ: 10000PCS;
Lead Time: Ship Within 45 Days After Payment;
|