少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

220V Defrost Heating Element Assembly Quartz Electric Tube Heater for Refrigerator Use

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Pieces US$0.60-1.00 / Piece

Sepcifications

  • Condition New
  • Transport Package Standard Export Packing
  • Trademark YK or Customized Logo
  • Origin China
  • Input Voltage 110~250V

Product Description

Product Parameters Prouduct Name: Frost Heater Motor Type: AC / DC / EC motor ( Air Conditioner Motors ) Material: AS/ABS/ABS+Glass Fiber/PP Voltage: ≤380V Power: Silicone Cap 100W~250W Work Temperature: Silicone Cap ≤ 180ºC Heat Resistingly Assaucting 1100ºC ...

Learn More

Frost Heater Comparison
Transaction Info
Price US$0.60-1.00 / Piece US$5.00-20.00 / Piece US$280.00-2,200.00 / Ton US$3,320.00-4,460.00 / Piece US$10,580.00-11,040.00 / Piece
Min Order 500 Pieces 1 Piece 1 Ton 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T, LC, D/P LC, T/T LC, T/T
Quality Control
Product Certification - CE ISO ISO, CE ISO, CE
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia East Asia(Japan/ South Korea), Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - - ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Product Attributes
Specification
Condition: New;
Input Voltage: 110~250V;
Condition: New;
Inlet Connection Type: Solder, ODF;
Inlet Size [mm]: 10;
Outlet Connection Type: Solder, ODF;
Outlet Size [mm]: 10;
Condition: New;
Application Industry: Mechanical Manufacturing, Steel Structure, Ships;
Width: 7.5mm-21mm(Customizable);
Type: 3#,4#,5#;
Length: 6000mm(Customizable);
Technique: Hot-DIP Galvanizing / Cold-DIP Galvanizing;
Surface Treatment: Galvanize/201/304;
Delivery Time: 30 Working Days;
Steel Grade: Q235B Q355b Ss400 Ss540 S235 S275 S355;
Condition: New;
Type: Refrigerant Recovery Machine;
Compressor: 2HP Oil-Free;
Vapor Recovery Rate: ≤40 Kg/H;
Liquid Recovery Rate: ≤100 Kg/H;
Push and Pull Recovery Rate: ≤600 Kg/H;
Voltage: 380V/50Hz;
Refrigerant: R410A/R22/R134A...;
Warranty: 1 Year;
Condition: New;
Type: Refrigerant Recovery Machine;
Compressor: Oil-Free (5HP);
Vapor Recovery Rate: ≤90 Kg/H;
Push and Pull Recovery Rate: ≤6000 Kg/H;
Scope of Application: ≤2000 Kg;
Refrigerant: CFC/Hcfc/Hfc Refrigerants;
Warranty: 1 Year;
After-Sales Service Provided: Engineers Available to Service Machinery Overseas;
Video Outgoing-Inspection: Provided;
Supplier Name

NINGBO YUKITO IMPORT & EXPORT CO., LTD.

Gold Member Audited Supplier

Shenzhen Sino-Australia Refrigeration Equipment Co., Ltd.

Diamond Member Audited Supplier

Wuxi Xuelun General Machinery Co., Ltd.

Diamond Member Audited Supplier

Nanjing Chunmu Refrigeration & Mechanical Electronic Equipment Tech Co., Ltd.

Gold Member Audited Supplier

Nanjing Chunmu Refrigeration & Mechanical Electronic Equipment Tech Co., Ltd.

Gold Member Audited Supplier

应用必备| 龙里县| 丽水市| 鄂伦春自治旗| 乾安县| 吴忠市| 来凤县| 汉川市| 鹤壁市| 友谊县| 绍兴县| 德格县| 合水县| 灌云县| 怀柔区| 永定县| 原平市| 文成县| 诸城市| 华阴市| 临邑县| 托里县| 江阴市| 五莲县| 合川市| 施秉县| 朝阳市| 泰兴市| 祁东县| 宜君县| 腾冲县| 诸暨市| 承德市| 纳雍县| 文昌市| 长子县| 宜宾县| 龙门县| 镇远县| 苍溪县| 石屏县|