少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Custom Injection Molding Produce Plastic Milk Crate for Storage

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$10,000.00-12,000.00 / Set

Sepcifications

  • Warranty 1 Year
  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material PP
  • Process Combination Type Single-Process Mode
  • Application Home Use
  • Runner Hot Runner
  • Design Software UG
  • Installation Fixed
  • Certification ISO
  • Standard DME
  • Customized Customized
  • After-sales Service 1 Year
  • Transport Package Wooden Crate
  • Specification Dme
  • Trademark JSLmould
  • Origin Huangyan, Taizhou, China
  • Wheelie Bin Mould Wheelie Bin Mold
  • Runner System for Cold or Hor Runner
  • Water Cooling by Experienced
  • Mold Standard Dme
  • Hot Sale We Do for Quality,Not Only for Price
  • Heatreatment Nitriding
  • Our Target Sane Every Penny for Client

Product Description

Product Name Milk Crate Injection Mold Product material PP;HDPE Core&Cavity Steel 718 Steel hardness: HRC34-38 Mould Standard DME Cavity Number 1 Injection System Pin gate Ejector System Ejector plate Cycle Time 30~50" Tooling lead time 60 days Mould life 1,000,000 times ...

Learn More

Injection Mold Comparison
Transaction Info
Price US$10,000.00-12,000.00 / Set US$5,000.00-10,000.00 / Set US$10,000.00-20,000.00 / Set US$5,000.00-10,000.00 / Set US$10,000.00-20,000.00 / Set
Min Order 1 Set 1 Set 1 Set 1 Set 1 Set
Payment Terms LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union
Quality Control
Product Certification ISO ISO ISO ISO ISO
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Product Attributes
Specification
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 1 Year;
Wheelie Bin Mould: Wheelie Bin Mold;
Runner System: for Cold or Hor Runner;
Water Cooling: by Experienced;
Mold Standard: Dme;
Hot Sale: We Do for Quality,Not Only for Price;
Heatreatment: Nitriding;
Our Target: Sane Every Penny for Client;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Quality Control: Professional QC in House Machine;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Ug,Proe,CAD,Catia,Solidworks;
Heat Treatment: Nitriding, etc;
Mould Design: 7days;
Mould Report: 7-10days Per Time;
T1 Sample: 50days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Quality Control: Professional QC in House Machine;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Ug,Proe,CAD,Catia,Solidworks;
Heat Treatment: Nitriding, etc;
Mould Design: 7days;
Mould Report: 7-10days Per Time;
T1 Sample: 50days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
Mould Base: S50c/C45;
Mould Quality Control: Professional QC in House Machine;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Ug,Proe,CAD,Catia,Solidworks;
Heat Treatment: Nitriding, etc;
Mould Design: 7days;
Mould Report: 7-10days Per Time;
T1 Sample: 50days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP/PE;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Hot Runner;
Design Software: Autocad, Ug, Proe, CAD, Catia, Solidworks;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Base: S50c/C45;
Mould Standard: Professional QC in House Machine;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding;
Quality Control: Professional QC in House Machine;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Automatically by CNC;
Heat Treatment: Nitriding, etc;
Mould Design: 3-7days;
Mould Report: 7-10days Per Time;
T1 Sample Time: 45-60 Days;
Supplier Name

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

贵定县| 莱芜市| 郑州市| 长治县| 梧州市| 饶阳县| 卫辉市| 淮北市| 潜江市| 屏南县| 博野县| 周至县| 曲周县| 兴安盟| 福州市| 新和县| 赤峰市| 清新县| 上林县| 阿合奇县| 乐清市| 蓝田县| 彰化市| 芜湖县| 高要市| 南投市| 郁南县| 宜君县| 兰州市| 林西县| 游戏| 开原市| 贡觉县| 横峰县| 金秀| 前郭尔| 万载县| 林芝县| 闻喜县| 宜章县| 永川市|