少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Prop Fork Head
US$2.51-2.92 / Piece
  • Recommend for you
  • How to Make BS1139 Certified Galvanized Steel Scaffolding Plank, Anti-Slip Walkboard, Heavy Duty for Construction
  • What is Galvanized Props for Building Shuttering Support Jacks Scaffolding Shoring Acrow Steel Prop
  • What is Factory Price Constructiont Steel Support Props Concrete Slab Steel Stand Formwork

What is Timber H20 Beam Support Scaffolding Formwork Prop Fork Head

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

50-999 Pieces US$2.92

1,000-4,999 Pieces US$2.78

5,000-19,999 Pieces US$2.68

20,000+ Pieces US$2.51

Sepcifications

  • Connection Type Pin Connection
  • Finish Galvanized
  • Material Steel
  • Transport Package Packaging
  • Origin Hebei Hengshui

Product Description

Product Description Product name steel prop accessories Materials STK400 (Q235) Surface treatment painted,powder coated, electro galvanized or hot dip galvanized Package Bundle Characteristics of steel props 1.Made of high-quality steel for durability and strength. 2.Designed to provide a safe and ...

Learn More

Prop Fork Head Comparison
Transaction Info
Price US$2.51-2.92 / Piece US$10.50-10.70 / Piece US$5.40-5.60 / Piece US$2.00 / Piece US$2.00 / Piece
Min Order 50 Pieces 1,000 Pieces 1,000 Pieces 500 Pieces 500 Pieces
Payment Terms T/T, LC LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets Africa, Domestic Europe Europe Europe Europe
Annual Export Revenue - - - - -
Business Model OEM ODM, OEM ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Product Attributes
Specification
Connection Type: Pin Connection;
Finish: Galvanized;
Material: Steel;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Metal;
Type: Insulating Tape;
Weight: 5.7kg;
Scaffolding Panel Clamp Technolic: Pressed+Forged;
Scaffolding Wing Nut Surface Treatment: Electro Galvanized, HDG;
MOQ: 2000PCS;
Scaffolding Wing Nut Certification: SGS, Sigma, ISO9001;
Advantage: Good Quality, Competitive Price.;
Business Type: Manufacturer and Exporter;
Packing: Woven Bags +Steel Pallet;
Service: OEM Service;
Scaffolding Forged Panel Clamp: as Your Drawing;
Product Name: Rasto Clamp Steel Rasto Ajustable Splice Rasto Ali;
Colour: Silver, Golden;
Wing Nut Material: Q235;
Delivery Time: 15-20days;
Application: Decorations;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Metal;
Type: Insulating Tape;
Weight: 2.8kg;
Scaffolding Panel Clamp Technolic: Pressed+Forged;
Scaffolding Wing Nut Surface Treatment: Electro Galvanized, HDG;
MOQ: 2000PCS;
Scaffolding Wing Nut Certification: SGS, Sigma, ISO9001;
Advantage: Good Quality, Competitive Price.;
Business Type: Manufacturer and Exporter;
Packing: Woven Bags +Steel Pallet;
Service: OEM Service;
Scaffolding Forged Panel Clamp: as Your Drawing;
Product Name: Construction Formwork Scaffolding Steel Rasto Syst;
Colour: Silver, Golden;
Wing Nut Material: Q355;
Delivery Time: 15-20days;
Application: Decorations;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Steel;
Type: Scaffold Frames;
Surface Treatment: Zinc Plated/Hot DIP Galvanized;
Delivery: 20 Days After Confirmation;
MOQ: 1000;
Weight: 1.01kg-1.9kg;
OEM: OEM Service;
Tech: Hot Drop Forged;
Formwork: Formwork Accessories;
Scaffolding: Scaffolding Parts;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Steel;
Type: Scaffold Frames;
Surface Treatment: Zinc Plated/Hot DIP Galvanized;
Delivery: 20 Days After Confirmation;
MOQ: 1000;
Weight: 1.01kg-1.9kg;
OEM: OEM Service;
Tech: Hot Drop Forged;
Formwork: Formwork Accessories;
Scaffolding: Scaffolding Parts;
Supplier Name

Hebei Derfon Building Materials Co., Ltd

Diamond Member Audited Supplier

Shandong Pinzheng Metal Products Co., Ltd.

Diamond Member Audited Supplier

Shandong Pinzheng Metal Products Co., Ltd.

Diamond Member Audited Supplier

Shandong Pinzheng Metal Products Co., Ltd.

Diamond Member Audited Supplier

Shandong Pinzheng Metal Products Co., Ltd.

Diamond Member Audited Supplier

温泉县| 嘉禾县| 博乐市| 平塘县| 九江市| 阿坝| 香河县| 高邑县| 沁水县| 茌平县| 廉江市| 个旧市| 木里| 囊谦县| 区。| 洞口县| 双峰县| 莱西市| 沙雅县| 甘洛县| 饶阳县| 锦屏县| 九江县| 榆社县| 思茅市| 哈尔滨市| 博客| 太谷县| 华安县| 张家界市| 通渭县| 阿拉尔市| 汉沽区| 深州市| 磐石市| 酉阳| 出国| 宁波市| 东莞市| 金川县| 苏州市|