Purchase Qty. Reference FOB Price
10-99 Pieces US$18.00
100-499 Pieces US$16.00
500+ Pieces US$15.00
Product Description
Ceramic connector terminal: Material of body: Steatite or alumina, which can bear high temperature test. Technical utilize: Hot press pouring technics, which can control the required tolerance to a range. The size is very precise. The required connecting hardware fittings used in interior line ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$15.00-18.00 / Piece | US$0.50-1.00 / Piece | US$2.00-10.00 / Piece | US$2.00-10.00 / Piece | US$0.50-1.00 / Piece |
| Min Order | 10 Pieces | 1,000 Pieces | 1 Piece | 1 Piece | 1,000 Pieces |
| Payment Terms | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | T/T, PayPal, Western Union | - | - | T/T, PayPal, Western Union | Quality Control |
| Product Certification | - | - | ISO | ISO | - |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Europe, Southeast Asia/ Mideast, Australia | North America, Eastern Europe, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, Eastern Europe, Eastern Asia, Western Europe |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | Own Brand, ODM | - | - | - | - |
| Average Lead Time | Peak Season Lead Time: within 15 workdays, one monthOff Season Lead Time: within 15 workdays, one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: within 15 workdays | Product Attributes |
| Specification | |||||
| Supplier Name |
Shanghai Gongtao Ceramics Co., Ltd.
|
Emi International (Hk) Co. Ltd
|
ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.
|
ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.
|
Emi International (Hk) Co. Ltd
|