少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

OEM PP Expansion Anchor Bolt for Building and Home Use

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

3,000 Pieces US$0.07-0.70 / Piece

Sepcifications

  • Material PP
  • Application Medical, Household, Electronics, Automotive, Agricultural
  • Certification TS16949, RoHS, ISO
  • Transport Package Customized
  • Specification customized
  • Origin Shenzhen, Guangdong
  • Unit Weight Customized
  • Quality Authentication ISO9001/Customized
  • Profit Model Factory
  • Service OEM ODM Custom

Product Description

Detailed Photos Product Description Product Name: injection silicone parts Place of Origin: SHENZHEN,GUANGDONG Main Material: pp Certification: ISO13485, ISO9001 OEM/ODM: Accept Lead time: 15-30 days after payment Sample: Free sample Warranty: 1 year Packing: customized ...

Learn More

High-Quality Silicone Part Comparison
Transaction Info
Price US$0.07-0.70 / Piece US$3.00-5.00 / Piece US$0.10-0.20 / Piece US$0.10-0.20 / Piece US$0.10-0.20 / Piece
Min Order 3,000 Pieces 5,000 Pieces 1,000 Pieces 1,000 Pieces 1,000 Pieces
Payment Terms T/T, LC, D/P, PayPal, Western Union LC, T/T, D/P, Small-amount payment, Western Union, PayPal T/T T/T T/T
Quality Control
Product Certification TS16949, RoHS, ISO TS16949, RoHS, ISO - - -
Management System Certification - ISO9001:2015 - - -
Trade Capacity
Export Markets Domestic Domestic North America, Southeast Asia, Mid East, Western Europe North America, Southeast Asia, Mid East, Western Europe North America, Southeast Asia, Mid East, Western Europe
Annual Export Revenue - - - - -
Business Model ODM, OEM Own Brand, ODM, OEM - - -
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month, 1-3 months
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Product Attributes
Specification
Material: PP;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Unit Weight: Customized;
Quality Authentication: ISO9001/Customized;
Profit Model: Factory;
Service: OEM ODM Custom;
Material: ABS;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Material: PP, ABS.PC, PA, Nylon, PE, PVC, PS, POM etc;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Shaping Mode: Injection Mould;
Installation: Fixed;
Customized: Customized;
Mould Cavity: Single or Mutlti Cavity;
Process Combination Type: Single Process or Multi Process;
Runner: Cold Runner or Hot Runner to Suit Different Needs;
After-Sales Service: We Are Always Stand Back at Our Supplies;
Design Software: Ug/Solidworks/PRO-E/Auto CAD;
Surface Finish Process: Polishing/Sand Blasting/Texturing;
Plastic Material: PC/PP/ABS/PVC/Nylon/Pet/PA6/Nylon/TPE;
Item Description: Plastic Trolley Tray;
Material: PP, ABS.PC, PA, Nylon, PE, PVC, PS, POM etc;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Shaping Mode: Injection Mould;
Installation: Fixed;
Customized: Customized;
Mould Cavity: Single or Mutlti Cavity;
Process Combination Type: Single Process or Multi Process;
Runner: Cold Runner or Hot Runner to Suit Different Needs;
After-Sales Service: We Are Always Stand Back at Our Supplies;
Design Software: Ug/Solidworks/PRO-E/Auto CAD;
Surface Finish Process: Polishing/Sand Blasting/Texturing;
Plastic Material: PC/PP/ABS/PVC/Nylon/Pet/PA6/Nylon/TPE;
Item Description: Plastic Trolley Tray;
Material: PP, ABS.PC, PA, Nylon, PE, PVC, PS, POM etc;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Shaping Mode: Injection Mould;
Installation: Fixed;
Customized: Customized;
Mould Cavity: Single or Mutlti Cavity;
Process Combination Type: Single Process or Multi Process;
Runner: Cold Runner or Hot Runner to Suit Different Needs;
After-Sales Service: We Are Always Stand Back at Our Supplies;
Design Software: Ug/Solidworks/PRO-E/Auto CAD;
Surface Finish Process: Polishing/Sand Blasting/Texturing;
Plastic Material: PC/PP/ABS/PVC/Nylon/Pet/PA6/Nylon/TPE;
Item Description: Plastic Trolley Tray;
Supplier Name

Shenzhen Fengqixin Hardware Products Co., LTD

Diamond Member Audited Supplier

Dongguan Houde Mold Technology Co., Ltd.

Diamond Member Audited Supplier

YUYAO SHINER PLASTICS MANUFACTORY CO., LTD.

Gold Member Audited Supplier

YUYAO SHINER PLASTICS MANUFACTORY CO., LTD.

Gold Member Audited Supplier

YUYAO SHINER PLASTICS MANUFACTORY CO., LTD.

Gold Member Audited Supplier

葵青区| 石门县| 华安县| 泌阳县| 昭平县| 宜昌市| 乌恰县| 闵行区| 朝阳市| 望城县| 鸡西市| 榕江县| 商丘市| 磐石市| 泸定县| 吉木乃县| 左云县| 绥江县| 峡江县| 合作市| 襄城县| 江门市| 康定县| 永川市| 杭锦旗| 迭部县| 桃江县| 东丰县| 宁德市| 京山县| 策勒县| 红河县| 封丘县| 岑溪市| 疏勒县| 沙洋县| 肇庆市| 旅游| 郓城县| 积石山| 修水县|