Min. Order Reference FOB Price
1 set Negotiable
Product Description
Head assembly machine Introduction The cylinder liner head assembly machine is used for the assembly of the liner tube section and the head. The cylinder liner head assembly machine adopts a symmetrical structure, and it consists of three parts: the cylinder section clamping round ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | Negotiable | US$50,000.00 / Piece | US$88,000.00-200,000.00 / Set | Negotiable | US$15,000.00-22,000.00 / Set |
| Min Order | 1 set | 1 Piece | 1 Set | 1 Set | 1 Set |
| Payment Terms | LC, T/T, PayPal, Western Union | LC, T/T | LC, T/T, PayPal | LC, T/T, D/P, PayPal, Western Union | - | Quality Control |
| Product Certification | CE, ISO | ISO9001:2000 | CE | ISO | CE, ISO |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Africa, Mid East, Eastern Asia | South America, Southeast Asia/ Mideast, Domestic | North America, Europe | South America, Europe, Southeast Asia/ Mideast | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | - |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 6-12 monthsOff Season Lead Time: 6-12 months | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 3-6 months | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Product Attributes |
| Specification | |||||
| Supplier Name |
HANGZHOU LINAN XINRAN SOLAR EQUIPMENT CO., LTD.
|
Yingkou Northern Steel Drum Manufacturing Equipment Technology Co., Ltd.
|
Dongguan ICT Technology Co.,Ltd.
|
Jinan Eagle CNC Machine Co., Ltd.
|
Zhengzhou Invech Machinery Co., Limited
|