Min. Order Reference FOB Price
500 Pieces US$1.10-3.30 / Piece
Product Description
Specification Five-hole connecting plate for power Tie wire anchor/Ground anchor is an important electrical connecting equipment. It is made of high-quality metal material, durable, fine surface treatment, with good electrical conductivity and corrosion resistance. The five holes are arranged ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$1.10-3.30 / Piece | US$16.00-20.00 / Piece | US$16.00-20.00 / Piece | US$16.00-20.00 / Piece | US$16.00-20.00 / Piece |
| Min Order | 500 Pieces | 2 Pieces | 2 Pieces | 2 Pieces | 2 Pieces |
| Payment Terms | LC, T/T, PayPal, Western Union, Small-amount payment, Money Gram | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | Quality Control |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, Eastern Europe, Southeast Asia, Africa | North America, Eastern Europe, Southeast Asia, Africa | North America, Eastern Europe, Southeast Asia, Africa | North America, Eastern Europe, Southeast Asia, Africa |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | - | - | - | - |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Product Attributes |
| Specification | |||||
| Supplier Name |
Baoding Sihedan Electric Technology Co., Ltd.
|
XIN CHENG INDUSTRY MATERIAL CO., LTD.
|
XIN CHENG INDUSTRY MATERIAL CO., LTD.
|
XIN CHENG INDUSTRY MATERIAL CO., LTD.
|
XIN CHENG INDUSTRY MATERIAL CO., LTD.
|