| Specification |
Die Casting Machine Type: Cold Chamber Die Casting Machine;
Die Casting Method: High Pressure Die Casting;
Application: Electronic Accessories;
Machining: CNC Machining;
Material: Aluminum Alloy;
Surface Preparation: Spray Coating;
Pressure Chamber Structure: Horizontal;
Tolerance Grade: 4;
Casting Surface Quality Level: 1;
|
Die Casting Machine Type: Hot Chamber Die Casting Machine;
Die Casting Method: Precision Die Casting;
Application: Auto Parts & Motor Parts & Electronic Accessories;
Machining: CNC Machining;
Material: Aluminum, A360/As80/A356;
Surface Preparation: Electroplating;
Pressure Chamber Structure: Horizontal;
Tolerance Grade: 4;
Casting Surface Quality Level: 2;
Finish: Polishing, Deburring, Painting, Sand Blasting;
Manufacturer: OEM;
Price: Competitive;
Mould Life: 100000PCS;
Capacity: 50000PCS/Monthly;
|
|
Die Casting Machine Type: Cold Chamber Die Casting Machine;
Die Casting Method: Precision Die Casting;
Application: Motor Part;
Machining: Machining Center;
Material: Aluminum Alloy;
Surface Preparation: Polishing;
Pressure Chamber Structure: Vertical;
Tolerance Grade: 6;
Casting Surface Quality Level: 2;
Process: Mould Manufacturing, Die Casting, CNC Machining;
Surface: Polishing,Shot Blasting,Powder Coating, Painting,E;
Drawing Format: 2D:Pdf, Dwg, 3D: Igs,STP,;
Quality Control: Flow Chart, Control Plan, Pfema, Cpk;
Inspection Tool: CMM, Normal Gague, Part Special Customized Gague;
Casting Tolerance: CT4-CT6;
Machining Tolerance: 0.001;
Part Weight: 10g-100kgs;
MOQ: 1PC;
Inspection: Isir,in-Process,Final Inspection;
|
Die Casting Machine Type: Cold Chamber Die Casting Machine;
Die Casting Method: Precision Die Casting;
Application: Pipe Fitting;
Machining: CNC Machining;
Material: Aluminum Alloy;
Surface Preparation: Deburring;
Pressure Chamber Structure: Horizontal;
Tolerance Grade: 6;
Casting Surface Quality Level: 1;
Payment: T/T, L/C, Western Union, Paypal;
Package: Cartons, Wooden Cases, Pallets;
Software Assistance: PRO-E/Solid Work/Ug/Auto CAD/Catia;
Surface: Trimming, Deburring,Polishing;
Delivery: 15 Days;
|