| Specification |
|
Material: ABS;
Place of Origin: China;
Mould Leadtime: 3-6 Weeks;
Port of Loading: Xiamen Port;
Applications: Electronics, Audio Parts, Acoustic Parts;
Surface Finish: Powder Coating, Silk-Printing, Laser Etching, etc;
Drawings: CAD, Cam, Cae, Solid Works, Caxa, Ug;
Machine: 80 Ton to 800 Ton;
Raw Material: PP, ABS, POM, Nylon, PC;
Usage: Auto Parts, Medical Appliance, Electronies;
|
Material: ABS;
Part Name: China Factory Made Westergren Plastic Tube for Med;
Mould Leadtime: 3-6 Weeks;
Port of Loading: Xiamen Port;
Applications: Electronics, Audio Parts, Acoustic Parts;
Surface Finish: Powder Coating, Silk-Printing, Laser Etching, etc;
Drawings: CAD, Cam, Cae, Solid Works, Caxa, Ug;
Machine: 80 Ton to 800 Ton;
Raw Material: PP, ABS, POM, Nylon, PC;
Usage: Auto Parts, Medical Appliance, Electronies;
|
Material: ABS;
Part Name: Plastic Injection Moulding Parts Plastic Wheel Mod;
Mould Leadtime: 3-6 Weeks;
Port of Loading: Xiamen Port;
Applications: Electronics, Audio Parts, Acoustic Parts;
Surface Finish: Powder Coating, Silk-Printing, Laser Etching, etc;
Drawings: CAD, Cam, Cae, Solid Works, Caxa, Ug;
Machine: 80 Ton to 800 Ton;
Raw Material: PP, ABS, POM, Nylon, PC;
Usage: Auto Parts, Medical Appliance, Electronies;
|
Material: Silicone Rubber;
|