Purchase Qty. Reference FOB Price
1-4 Sets US$10,788.00
5+ Sets US$7,888.00
Product Description
Product Description Compact Industrial Manual Powder Coating Machine Package for Small Workshops Engineered for restricted footprints, this streamlined manual powder coating system integrates a U-shape overhead track to maximize productivity and reduce efforts. The ideal solution for small to ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$7,888.00-10,788.00 / Set | US$25.00 / Piece | US$55.00 / Piece | US$1,150.00-1,250.00 / Piece | US$30,000.00 / Set |
| Min Order | 1 Set | 1 Piece | 1 Piece | 1 Piece | 1 Set |
| Payment Terms | LC, T/T, PayPal, Western Union, Money Gram | LC, T/T, PayPal, Western Union, alibaba online | LC, T/T, PayPal, Western Union, alibaba online | LC, T/T, PayPal, Western Union, alibaba online | LC, T/T | Quality Control |
| Product Certification | - | CE | CE | CE | ISO |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | Own Brand | Own Brand | Own Brand | - |
| Average Lead Time | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Peak Season Lead Time: 6-12 monthsOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
Hangzhou Kafan Machinery & Equipment Co.,Ltd.
|
Hangzhou Guozhen Wanxin Coating Equipments Manufacturing Co., Ltd.
|
Hangzhou Guozhen Wanxin Coating Equipments Manufacturing Co., Ltd.
|
Hangzhou Guozhen Wanxin Coating Equipments Manufacturing Co., Ltd.
|
Changzhou Yibu Drying Equipment Co., Ltd.
|