少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Axial Flow High Pressure Regulator

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$2,000.00 / Piece

Sepcifications

  • Media Gas
  • Certification ISO, CE
  • Temperature Ordinary Temperature
  • Connection Flange
  • Valve Seat Single-Seat
  • Structure Diaphragm
  • Material Cast Iron
  • Transport Package Wooden Case
  • Specification WCB
  • Trademark CT
  • Origin China
  • Name Gas Regulator
  • Max Pressure 10MPa
  • Outlet Pressure 0.1-8.0MPa
  • Flow 2000m3/H
  • Ssv No

Product Description

Second Stage Axial Flow Pressure Regulator for CNG Station CTZ regulator is a type of self-operated regulator with pilot, which is especially suitable for pressure regulating gate stations, storage and distribution stations and places where large and medium-sized industrial users need to adjust ...

Learn More

High Pressure Regulator Comparison
Transaction Info
Price US$2,000.00 / Piece US$75.00-580.00 / Piece US$38.00-129.00 / Piece US$38.00-129.00 / Piece US$38.00-129.00 / Piece
Min Order 1 Piece 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, Western Union, PayPal, Small-amount payment - T/T, D/P T/T, D/P T/T, D/P
Quality Control
Product Certification ISO, CE CE - - -
Management System Certification - - ISO9001:2015 ISO9001:2015 ISO9001:2015
Trade Capacity
Export Markets South America, Southeast Asia/ Mideast, Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe East Asia(Japan/ South Korea), Domestic East Asia(Japan/ South Korea), Domestic East Asia(Japan/ South Korea), Domestic
Annual Export Revenue - - - - -
Business Model ODM, OEM - ODM, OEM ODM, OEM ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Product Attributes
Specification
Media: Gas;
Temperature: Ordinary Temperature;
Connection: Flange;
Valve Seat: Single-Seat;
Structure: Diaphragm;
Material: Cast Iron;
Name: Gas Regulator;
Max Pressure: 10MPa;
Outlet Pressure: 0.1-8.0MPa;
Flow: 2000m3/H;
Ssv: No;
Media: Gas;
Temperature: Ordinary Temperature;
Connection: Thread;
Valve Seat: Single-Seat;
Structure: Diaphragm;
Material: Stainless Steel;
MOQ: 2 PCS;
Delivery Time: 7-10 Days;
Inlet Pressure: 3500 Psi;
Outlet Pressure: 500 Psi;
Application: Gas System;
Media: Gas,Water;
Temperature: Ordinary Temperature;
Connection: Thread;
Valve Seat: Single-Seat;
Structure: Piston;
Material: Steel Blue,Stainless Steel;
Product Name: Branch Pressure Reducing Valve;
Media: Gas,Water;
Temperature: Ordinary Temperature;
Connection: Thread;
Valve Seat: Single-Seat;
Structure: Piston;
Material: Steel Blue,Stainless Steel;
Product Name: Branch Pressure Reducing Valve;
Media: Gas,Water;
Temperature: Ordinary Temperature;
Connection: Thread;
Valve Seat: Single-Seat;
Structure: Piston;
Material: Steel Blue,Stainless Steel;
Product Name: Branch Pressure Reducing Valve;
Supplier Name

Leshan Chuantian Gas Equipment Co., Ltd.

Gold Member Audited Supplier

Suzhou Nai Lok Fluid Technology Co., Ltd.

Diamond Member

Top Valves Manufacture(Nantong) Co., Ltd.

Diamond Member Audited Supplier

Top Valves Manufacture(Nantong) Co., Ltd.

Diamond Member Audited Supplier

Top Valves Manufacture(Nantong) Co., Ltd.

Diamond Member Audited Supplier

平凉市| 萨嘎县| 九江市| 张家口市| 福清市| 松桃| 南陵县| 瓦房店市| 双流县| 淅川县| 湖州市| 阳泉市| 灵武市| 徐水县| 于都县| 呼图壁县| 柳林县| 阜康市| 招远市| 景宁| 耒阳市| 枝江市| 西和县| 景德镇市| 阿合奇县| 乌海市| 光泽县| 武夷山市| 方城县| 余江县| 潢川县| 百色市| 邹城市| 进贤县| 岳普湖县| 韶关市| 安溪县| 新丰县| 聂荣县| 景宁| 敦煌市|