少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Commercial Stainless Steel Worktable
US$67.07-166.14 / Piece
  • Recommend for you
  • What is Hot Sale Stainless Steel Kitchen Workbench Heavy Duty Stainless Steel Table Commercial Restaurant Food Prep Work Table for Hotel
  • What is Unfolded CE Approved Changtai Plywood Strip Package Kitchen Equipment Stainless Steel Work Bench
  • What is Heavy Duty Stainless Steel Dining Work Table for Efficient Use

What is Commercial Kitchen Stainless Steel Triple Layer Flat-Plate Worktable Food Preparation Table

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$67.07-166.14 / Piece

Sepcifications

  • Certification CE
  • Fixed Unfixed
  • Folded Unfolded
  • Shape Rectangle
  • Transport Package Choose According to Your Needs
  • Specification 1200/1500/1800*800*800
  • Trademark Changtai
  • Origin Shandong, China
  • Product Name Triple Layer Flat-Plate Worktable
  • Material Stainless Steel 201/304
  • Thickness 0.8/1.0/1.2/1.5mm
  • Size Accept Customization
  • Color Sliver
  • Assembly Form Removable
  • Casters Included Customizable
  • Use Occation Restaurant, Commercial Kitchen Ware
  • Style Customized Accepted
  • Wheel Customized Accepted
  • MOQ 1 Set
  • Keywords Stainless Steel Work Table

Product Description

Product Description Stainless steel work table The Triple Layer Flat - Plate Worktable is a kitchen marvel! Crafted from premium stainless steel, it's durable, resisting corrosion and stains. With three flat shelves, it maximizes vertical storage—ideal for organizing ingredients, cookware, or ...

Learn More

Commercial Stainless Steel Worktable Comparison
Transaction Info
Price US$67.07-166.14 / Piece US$15.00-20.00 / Set US$81.00-85.00 / Set US$81.00-85.00 / Set US$199.00-200.00 / Set
Min Order 1 Piece 10 Sets 10 Sets 10 Sets 10 Sets
Payment Terms LC, T/T, PayPal, Western Union LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Product Certification CE - - - -
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia North America, Western Europe North America, Western Europe North America, Western Europe North America, Western Europe
Annual Export Revenue - - - - -
Business Model ODM, OEM - - - -
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays Peak Season Lead Time: within 15 workdays Peak Season Lead Time: within 15 workdays Peak Season Lead Time: within 15 workdays
Product Attributes
Specification
Fixed: Unfixed;
Folded: Unfolded;
Shape: Rectangle;
Product Name: Triple Layer Flat-Plate Worktable;
Material: Stainless Steel 201/304;
Thickness: 0.8/1.0/1.2/1.5mm;
Size: Accept Customization;
Color: Sliver;
Assembly Form: Removable;
Casters Included: Customizable;
Use Occation: Restaurant, Commercial Kitchen Ware;
Style: Customized Accepted;
Wheel: Customized Accepted;
MOQ: 1 Set;
Keywords: Stainless Steel Work Table;
Fixed: Fixed;
Folded: Unfolded;
Shape: Square;
Size: Customized;
Function: Customized;
Structure: Floor Standing;
Logo: Silk Print, Laser Marking;
Price Term: Fob, Ex Work;
Service: Sheet Metal Fabrication, Assembly Support;
Fixed: Fixed;
Folded: Unfolded;
Shape: Square;
Size: Customized;
Thickness: 0.8-1.5mm;
Components: RFID, Touch Screen, Password Lock, Card Access;
Services: Design and Engineering, Sheet Metal Fabrication;
Additional Services: Electronical Assembly, System Integration;
Price Term: Fob, Ex Work;
Lead Time: Normally About 30-45 Days After Deposit Received.;
Fixed: Fixed;
Folded: Unfolded;
Shape: Square;
Size: Customized;
Thickness: 0.8-1.5mm;
Components: RFID, Touch Screen, Password Lock, Card Access;
Services: Design and Engineering, Sheet Metal Fabrication;
Additional Services: Electronical Assembly, System Integration;
Price Term: Fob, Ex Work;
Lead Time: Normally About 30-45 Days After Deposit Received.;
Fixed: Fixed;
Folded: Unfolded;
Shape: Square;
Size: Customized;
Thickness: 0.8-1.5mm;
Components: RFID, Touch Screen, Password Lock, Card Access;
Services: Design and Engineering, Sheet Metal Fabrication;
Additional Services: Electronical Assembly, System Integration;
Price Term: Fob, Ex Work;
Lead Time: Normally About 30-45 Days After Deposit Received.;
Supplier Name

Shangdong Boxing Changtai Environmental Protection Technology Co., Ltd.

Diamond Member Audited Supplier

Jiangmen Huazhi Technology Co., Ltd.

Diamond Member Audited Supplier

Jiangmen Huazhi Technology Co., Ltd.

Diamond Member Audited Supplier

Jiangmen Huazhi Technology Co., Ltd.

Diamond Member Audited Supplier

Jiangmen Huazhi Technology Co., Ltd.

Diamond Member Audited Supplier

闽侯县| 东莞市| 阿克陶县| 仁怀市| 云和县| 纳雍县| 余庆县| 新兴县| 崇信县| 龙胜| 安仁县| 洛宁县| 安乡县| 富阳市| 信丰县| 阿荣旗| 阿拉善左旗| 祁阳县| 汝州市| 温州市| 太白县| 和平区| 海宁市| 正阳县| 随州市| 安丘市| 水富县| 西宁市| 河津市| 托里县| 淮北市| 通河县| 琼中| 丹江口市| 伊金霍洛旗| 阿拉尔市| 牡丹江市| 新河县| 皋兰县| 秦安县| 旅游|