少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Beer Kegs Washing and Filling Machine Unit Machine

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 Piece US$3,000.00

2+ Pieces US$2,000.00

Sepcifications

  • After-sales Service After Sales
  • Warranty 2 Years
  • Processing Material Natural Ingredients
  • Application Beverage
  • Customized Customized
  • Certification CE
  • Power Source Electric
  • Automatic Grade Semi-Automatic
  • Transport Package Iron Frame + Wooden Box
  • Specification 300L-20000L
  • Trademark Cassman
  • Origin Jinan
  • Parts 1 100-2000L Fermenters/Bbt
  • Parts 2 100L-5000L Brewhouse 2,3,4 Vessels
  • Parts 3 Hot Liquor Tank
  • Parts 4 Cold Liquor Tank
  • Parts 5 50L 100L 200L 300L CIP
  • Parts 6 Chiller
  • Parts 7 Malt Mill
  • Parts 8 Control System
  • Drawing Provided Before Production, Customized

Product Description

Beer Kegs Washing and Filling Machine Double heads - One head for filling, one for washing 30-40Kegs/hour heated by electricity Siemens touch screen and PLC system CHINT breaker &contactors; Outside Size: 1200mm×1000mm×1750mm; Keg spears: A D G, etc (Should be confrimed before ...

Learn More

Beer Brewery Equipment Comparison
Transaction Info
Price US$2,000.00-3,000.00 / Piece US$100,000.00-1,000,000.00 / Set US$100,000.00-1,000,000.00 / Set US$8,452,000.00-28,573,000.00 / Set US$8,452,000.00-28,573,000.00 / Set
Min Order 1 Piece 1 Set 1 Set 1 Set 1 Set
Payment Terms LC, T/T, D/P, Western Union LC, T/T LC, T/T LC, T/T LC, T/T
Quality Control
Product Certification CE CE, ISO9001 CE, ISO9001 CE, ISO9001 CE, ISO9001
Management System Certification - - - - -
Trade Capacity
Export Markets North America, Eastern Europe, Oceania, Western Europe Africa, South Asia Africa, South Asia North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East
Annual Export Revenue - - - - -
Business Model - ODM ODM - -
Average Lead Time - Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 3-6 months
Product Attributes
Specification
After-sales Service: After Sales;
Warranty: 2 Years;
Processing Material: Natural Ingredients;
Application: Beverage;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Parts 1: 100-2000L Fermenters/Bbt;
Parts 2: 100L-5000L Brewhouse 2,3,4 Vessels;
Parts 3: Hot Liquor Tank;
Parts 4: Cold Liquor Tank;
Parts 5: 50L 100L 200L 300L CIP;
Parts 6: Chiller;
Parts 7: Malt Mill;
Parts 8: Control System;
Drawing: Provided Before Production, Customized;
After-sales Service: Engineer Installations;
Warranty: 1 Year Free Warranty;
Processing Material: Rice;
Application: Rice Vermicelli;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
After-sales Service: Engineer Installations;
Warranty: 1 Year Free Warranty;
Processing Material: Rice;
Application: Rice Vermicelli;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
Supplier Name

Jinan Cassman Machinery Co., Ltd.

Diamond Member Audited Supplier

Wuhan G-Young Industry & Trade Co., Ltd.

Gold Member Audited Supplier

Wuhan G-Young Industry & Trade Co., Ltd.

Gold Member Audited Supplier

Beijing Meckey Engineering Co.

Diamond Member Audited Supplier

Beijing Meckey Engineering Co.

Diamond Member Audited Supplier

巴南区| 东港市| 东乌珠穆沁旗| 北辰区| 灯塔市| 海南省| 平昌县| 连城县| 上杭县| 贵南县| 南丹县| 珠海市| 钟山县| 尚义县| 河北省| 师宗县| 平利县| 顺昌县| 曲沃县| 襄垣县| 防城港市| 香港| 宁德市| 江北区| 广水市| 南平市| 井研县| 昭苏县| 祥云县| 贵定县| 印江| 博湖县| 巴东县| 柳林县| 宝鸡市| 望城县| 临洮县| 宝山区| 仁寿县| 林芝县| 庆城县|