少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Pipeline Fabrication Solution
US$20,000.00-100,000.00 / Piece
  • Recommend for you
  • What is Automatic Pipe Welding Machine (TIG/MIG/saw)
  • What is Hydraulic Lifting System/ Jacking System/ Lift System for Tank Construction
  • What is Automatic Horizontal Seam Welding Machine (AGW) Tank Construction Machinery

What is Pipeline Fabrication Solution Pipe Production Line Welding Machine

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$20,000.00-100,000.00 / Piece

Sepcifications

  • Transport Package Packed in Container
  • Specification SGS
  • Trademark AUTO ELECTRIC
  • Origin China
  • Product Name Pipeline Fabrication Solution & Pipe Production Li
  • Brand Name Naec
  • Suitable for Material CS/Ss/as
  • Control Mode PLC
  • Welding Process TIG/MIG/Saw
  • Suitable for Pipe Dia. Range 2~60"
  • Transmission Type Flexible
  • Automatic Production Line Assembly
  • Flexible Production Lean Production
  • Rhythm Flow Production Line
  • Production Scope Product Line

Product Description

pipeline fabrication solution &pipe production line It has features as following: 1.Suitable for pipe diameter:2~60" 2.Suitable for Pipe SCH:3~80mm 3.High speed and accurate cutting processing efficiency and effect 4.Multi-types of bevel type, including single V, double V and J type ...

Learn More

Pipeline Fabrication Solution Comparison
Transaction Info
Price US$20,000.00-100,000.00 / Piece US$1.50-6.50 / Piece US$1.50-6.50 / Piece US$1.50-6.50 / Piece US$1.50-6.50 / Piece
Min Order 1 Piece 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Payment Terms LC, T/T LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification - ISO9001:2015 ISO9001:2015 ISO9001:2015 ISO9001:2015
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Domestic Domestic Domestic Domestic
Annual Export Revenue - - - - -
Business Model - ODM ODM ODM ODM
Average Lead Time Peak Season Lead Time: 6-12 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Product Name: Pipeline Fabrication Solution & Pipe Production Li;
Brand Name: Naec;
Suitable for Material: CS/Ss/as;
Control Mode: PLC;
Welding Process: TIG/MIG/Saw;
Suitable for Pipe Dia. Range: 2~60";
Transmission Type: Flexible;
Automatic Production Line: Assembly;
Flexible Production: Lean Production;
Rhythm: Flow Production Line;
Production Scope: Product Line;
Surface Treatment: Powder Coated;
Energy Source: Electric Arc;
Material: Aluminum Plate;
Drawing Format: Step, STP, Igs, CAD, Pdf, Dwg, etc.;
Process: Laser Cutting, Bending, Stamping, Welding, etc;
Raw Material: Aluminum,Stainless Steel,Carbon Steel, as Request;
Finish: Powder Coating/ Anodizing/as Request;
Delivery Time: 5-25 Days Depends on The Order Quantities;
Surface Treatment: Powder Coated;
Energy Source: Electric Arc;
Material: Aluminum Plate;
Drawing Format: Step, STP, Igs, CAD, Pdf, Dwg, etc.;
Process: Laser Cutting, Bending, Stamping, Welding, etc;
Raw Material: Aluminum,Stainless Steel,Carbon Steel, as Request;
Finish: Powder Coating/ Anodizing/as Request;
Delivery Time: 5-25 Days Depends on The Order Quantities;
Surface Treatment: Powder Coated;
Energy Source: Electric Arc;
Material: Aluminum Plate;
Drawing Format: Step, STP, Igs, CAD, Pdf, Dwg, etc.;
Process: Laser Cutting, Bending, Stamping, Welding, etc;
Raw Material: Aluminum,Stainless Steel,Carbon Steel, as Request;
Finish: Powder Coating/ Anodizing/as Request;
Delivery Time: 5-25 Days Depends on The Order Quantities;
Surface Treatment: Powder Coated;
Energy Source: Electric Arc;
Material: Aluminum Plate;
Drawing Format: Step, STP, Igs, CAD, Pdf, Dwg, etc.;
Process: Laser Cutting, Bending, Stamping, Welding, etc;
Raw Material: Aluminum,Stainless Steel,Carbon Steel, as Request;
Finish: Powder Coating/ Anodizing/as Request;
Delivery Time: 5-25 Days Depends on The Order Quantities;
Supplier Name

Nanjing Auto Electric Co., Ltd.

Diamond Member Audited Supplier

Qingdao Shunaojia Machinery Technology Co., Ltd.

Gold Member Audited Supplier

Qingdao Shunaojia Machinery Technology Co., Ltd.

Gold Member Audited Supplier

Qingdao Shunaojia Machinery Technology Co., Ltd.

Gold Member Audited Supplier

Qingdao Shunaojia Machinery Technology Co., Ltd.

Gold Member Audited Supplier

冕宁县| 霞浦县| 宣恩县| 志丹县| 务川| 印江| 庆城县| 万源市| 新邵县| 嵩明县| 花莲市| 和顺县| 贞丰县| 寿光市| 杭州市| 阿鲁科尔沁旗| 确山县| 安远县| 凤山市| 永清县| 江门市| 柏乡县| 景洪市| 桐柏县| 罗定市| 永春县| 长寿区| 扎兰屯市| 双柏县| 安阳市| 绍兴市| 赤水市| 上思县| 卫辉市| 汽车| 安乡县| 临泉县| 西林县| 益阳市| 泗洪县| 台北市|