少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Porous Asphalt
US$2.50-4.15 / kg
  • Recommend for you
  • What is All Weather DIY Cold Mix Asphalt Patch Bags Driveway Repair Cold Lay 20kgs
  • What is Self-Adhesive Asphalt Seam Tape for Road Surface Cracks
  • What is Bituminous Tape for Waterproof Asphalt Road Tape Quick Repair

What is Drainage Pavement Porous Asphalt Asphalt Additives

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 kg US$2.50-4.15 / kg

Sepcifications

  • Application Drainage Asphalt
  • Transport Package 25kgs/Bag
  • Origin China
  • Other Name Porous Asphalt Additives
  • Keywords Ogfc / PAC Asphalt

Product Description

Drainage Pavement Porous Asphalt Asphalt Additives Product Description ZTH high-viscosity asphalt modifier that improves the viscosity of asphalt mixture. It is a special high viscosity modifier for permeable asphalt pavement, even suitable for high temperature and heavy load traffic. The ...

Learn More

Porous Asphalt Comparison
Transaction Info
Price US$2.50-4.15 / kg US$1,030.00-1,620.00 / Ton US$1,030.00-2,120.00 / Ton US$1,950.00-3,200.00 / Ton US$1,950.00-3,200.00 / Ton
Min Order 1 kg 3 Tons 3 Tons 11 Tons 11 Tons
Payment Terms LC, T/T, D/P, PayPal, Western Union T/T, LC, D/P, PayPal T/T, LC, D/P, PayPal T/T, LC, D/P, PayPal T/T, LC, D/P, PayPal
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, Domestic Africa, Domestic Africa, Domestic Africa, Domestic Africa, Domestic
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM Own Brand, ODM Own Brand, ODM Own Brand, ODM Own Brand, ODM
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Application: Drainage Asphalt;
Other Name: Porous Asphalt Additives;
Keywords: Ogfc / PAC Asphalt;
Application: Construction;
Bonding Strength: High Bonding Strength;
Setting Time: Fast Setting;
Type: Viscosity Reducer Admixture;
CAS No.: 24937-78-8;
Einecs No.: 429-840-1;
Purity: 99.99%;
Mf: (C2h4)X.(C4h6o2)Y;
Other Names: Rdp/Vae/Redispersible Powder;
Model No.: Kld01-04;
Solid Content: >99.9%;
Appearance: White Powder, Freely Flowing;
Type: Anti-Corrosion Admixture;
CAS No.: 24937-78-8;
Einecs No.: 429-840-1;
Purity: 99.99%;
Mf: (C2h4)X.(C4h6o2)Y;
Other Names: Rdp/Vae/Redispersible Powder;
Model No.: Kld01-04;
Solid Content: >99.9%;
Appearance: White Powder, Freely Flowing;
Type: Viscosity Reducer Admixture;
Usage: Tile Adhesive;
Usage 2: Paint Chemicals;
Usage 3: Wall Putty;
Usage 4: Dry Mortar Thickener;
Usage 5: Wall Skim Coat;
Usage 6: Construction Plasters Additives;
Usage 7: Mortar Water-Retaining Agent;
Usage 8: Building Mortar Adhesive;
Type: Viscosity Reducer Admixture;
Usage: Tile Adhesive;
Usage 2: Paint Chemicals;
Usage 3: Wall Putty;
Usage 4: Dry Mortar Thickener;
Usage 5: Wall Skim Coat;
Usage 6: Construction Plasters Additives;
Usage 7: Mortar Water-Retaining Agent;
Usage 8: Building Mortar Adhesive;
Supplier Name

Beijing Zhongtian Road Tech Co.Ltd

Gold Member Audited Supplier

GUANGTONG CLYDE CHEMICAL CO., LTD.

Diamond Member Audited Supplier

GUANGTONG CLYDE CHEMICAL CO., LTD.

Diamond Member Audited Supplier

GUANGTONG CLYDE CHEMICAL CO., LTD.

Diamond Member Audited Supplier

GUANGTONG CLYDE CHEMICAL CO., LTD.

Diamond Member Audited Supplier

政和县| 十堰市| 阿荣旗| 武宣县| 合水县| 兰考县| 铁岭县| 广宁县| 辰溪县| 十堰市| 惠州市| 庆阳市| 西盟| 白玉县| 镇安县| 双鸭山市| 淮北市| 新宁县| 斗六市| 朝阳县| 阜城县| 波密县| 淮南市| 河西区| 体育| 温州市| 星座| 阜平县| 崇信县| 额敏县| 西藏| 澄城县| 黄梅县| 堆龙德庆县| 红河县| 盘锦市| 临漳县| 新密市| 镇康县| 巩留县| 西乡县|