| Specification |
Application: Elevator;
Carrying Capacity: Weight Level;
Material: Steel;
Usage: Used for Elevator Guide Rail;
Standard: DIN558, DIN125;
Dimension: M10, M12, M14, M16, M18;
T1 (M10): T45/a, T50/a;
T2 (M12): T70-1/B, T75-3/B, T82/B;
T3 (M14): T78/B, T89/B, T90/B;
T4 (M16): T114/B, T127-1/B, T127-2/B;
T5 (M18): T140-1/B, T140-2/B;
Technology 1: Forged Clip;
Technology 2: Cast Iron Clip;
Feature: Antiseptic;
Driven Type: No;
Installation: Elevator Guide Rail;
Structure: T Type;
Running Mode: No;
|
Carrying Capacity: Weight Level;
Material: Steel;
Product Name: Guide Rail;
Other Specification: T114, T90, T70, T50, T45;
Delivery Time: 30 Days;
Delivery: by Sea;
Payment Term: Fob Zhangjiagang;
Driven Type: Rack&Pinion;
Running Mode: Moving;
Feature: Insulating;
Structure: Shaft;
Installation: Building;
|
Carrying Capacity: Weight Level;
Length: 5 M;
Material: Steel;
Product Name: Guide Rail;
Other Specification: T114, T90, T70, T50, T45;
Delivery Time: 30 Days;
Delivery: by Sea;
Payment Term: Fob Zhangjiagang;
Quality: Machined;
Driven Type: Rack&Pinion;
Running Mode: Moving;
Feature: Insulating;
Structure: Shaft;
Installation: Building;
|
Carrying Capacity: Weight Level;
Material: Steel;
Product Name: Guide Rail;
Other Specification: T114, T90, T70, T50, T45;
Delivery Time: 30 Days;
Delivery: by Sea;
Payment Term: Fob Zhangjiagang;
Driven Type: Rack&Pinion;
Running Mode: Moving;
Feature: Insulating;
Structure: Shaft;
Installation: Building;
|
Carrying Capacity: Weight Level;
Material: Steel;
Product Name: Guide Rail;
Other Specification: T114, T90, T70, T50, T45;
Delivery Time: 30 Days;
Delivery: by Sea;
Payment Term: Fob Zhangjiagang;
Driven Type: Rack&Pinion;
Running Mode: Moving;
Feature: Insulating;
Structure: Shaft;
Installation: Building;
|