少妇高潮喷水久久,丁香婷婷久久一区二区,中文字幕亚洲区日日骚,欧美婷婷一区二区三区,98新超碰,激情色专线,老司机精品视频。,日日骚AV片日韩不卡,伊人狼人久久网

Stage Steel Building Material Scaffold System Ringlock Formwork H Frames for Sale

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$24.00-89.00 / Piece

Sepcifications

  • After-sales Service Provide After Sale Service
  • Warranty Provide After Sale Service
  • Material Steel
  • Type Scaffold
  • Structural Style Tower Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Scaffolding
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Normal Package
  • Specification 48.3mm
  • Trademark OEM/ODM
  • Origin China
  • Certificate ISO9001/SGS
  • Finished Galvanized
  • Usage Scaffolding System
  • Function Scaffold/Building Materiao

Product Description

stage steel building material scaffold system ringlock formwork h frames for sale StandardBuilding material galivanized scaffolding base ringlock jack base Code Description RFH-B001A 19.7in 500mm 39.4in 1000mm 47.2in ...

Learn More

Scaffold System Comparison
Transaction Info
Price US$24.00-89.00 / Piece Negotiable US$225.00-300.00 / Meter Negotiable US$200.00-260.00 / Meter
Min Order 1 Piece 1,000 Pieces 10 Meters 6 Meters 6 Meters
Payment Terms T/T LC, T/T LC, T/T, Western Union LC, T/T, Western Union LC, T/T, Western Union
Quality Control
Product Certification ISO9001/SGS En74,BS1139 ... - - -
Management System Certification - - Others Others Others
Trade Capacity
Export Markets Europe, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East North America, Europe, Africa North America, Europe, Africa North America, Europe, Africa
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM - Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Scaffold;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Finished: Galvanized;
Usage: Scaffolding System;
Function: Scaffold/Building Materiao;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: Connected Scaffolding;
Move Method: /;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Finishing: Zine Coated or as Your Customized;
Size: Components for O.D.48/60mm Diameter Tubers;
Usage: Fixed Scaffolding Pipe;
Process: Forged & Pressed;
Packing: Woven Bags + Steel Pallets;
MOQ: 1000PCS;
Price Terms: Fob, CIF,CFR;
Payment Terms: T/T, L/C, and So on;
Delivery Time: Within 15~30 Days After Receiving Deposit;
Material: Aluminum;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Height: 2m-40m;
Platform Material: Laminated Plywood or Aluminum Alloy;
Platform Size: 2m*0.6m;
Wheels: 6 Inches or 8 Inches;
Material: Aluminum;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Height: 2m-40m;
Platform Material: Laminated Plywood or Aluminum Alloy;
Platform Size: 2m*0.6m;
Wheels: 6 Inches or 8 Inches;
Material: Aluminum;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Product Name: Portable Aluminum Scaffolding for Sale;
Frame Material: Aluminum 6082-T6;
Main Tube: 51*2mm;
Height: 2m-40m;
Platform Load: 272kg;
Entire Load: 900kg;
Feature: Mobile, Stable and Durable;
Platform Size: 2m*0.6m;
Platform Material: Laminated Plywood or Aluminum Alloy;
Wheels: 6 Inches or 8 Inches;
Supplier Name

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Suzhou TECON Construction Technology Co., Ltd.

Diamond Member Audited Supplier

Guangzhou Kenzo Performance Equipment Co., Ltd.

Diamond Member Audited Supplier

Guangzhou Kenzo Performance Equipment Co., Ltd.

Diamond Member Audited Supplier

Guangzhou Kenzo Performance Equipment Co., Ltd.

Diamond Member Audited Supplier

黎川县| 大姚县| 靖安县| 胶南市| 金寨县| 莱阳市| 曲阳县| 开平市| 鄂尔多斯市| 西吉县| 桐城市| 崇州市| 共和县| 遂川县| 饶河县| 青州市| 甘洛县| 隆化县| 龙泉市| 桦川县| 封开县| 海南省| 广水市| 周宁县| 土默特右旗| 巨野县| 泰宁县| 襄垣县| 顺义区| 湘潭县| 乌拉特中旗| 介休市| 中江县| 调兵山市| 浦东新区| 若尔盖县| 贺兰县| 西乌珠穆沁旗| 称多县| 商洛市| 茂名市|